Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC KHOTTADIH COLLIERY BURDWAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BURDWAN | WEST BENGAL | 713378 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR |
Tender Value
₹15.9 L
EMD Value
₹20,000
Closing Date
6 Mar 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Shifting of electrical equipment phase wise in 37EL district of R-IV seam of Khottadih Colliery.
2023_ECL_272093_1
GM-PND/EandM/22-23/82/2431 dated 20/02/2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
15 Mar 2023
23 Feb 2023
7 Mar 2023
24 Feb 2023
6 Mar 2023
24 Feb 2023
24 Feb 2023 - 3 Mar 2023
Amount
Shifting of electrical equipment phase wise in 37EL district of R-IV seam of Khottadih Colliery. (Inclusive of CMPF/EPF)
Transportation of 70 sq.mm. PVC (L.T.) cable of length 250 mtr. from unit store to 37L dist. for secondary cable
Transportation of 35 sq.mm. PVC (L.T.) cable of length 200 mtr. from unit store to 37L dist. for Auxiliary fan & drill panel
Shifting of dist. controlling ACB of LHD & UDM by 35 mtr. with 70 sq.mm. PVC cable for both sides of conveyor (28 Times)
Shifting of FGEB & drill panel of LHD & UDM with power cable by 35 mtr. for both sides of conveyor (28 Times)
Shifting of Auxiliary fan with starter & cable for both sides of conveyor (28 Times)
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
techsummary_281545.pdf
PDF • 0.72 MB
finsummary_281545.pdf
PDF • 0.04 MB
WO82ENM2223.pdf
PDF • 0.04 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .