Loading…
Loading…
Tender Value
₹66.2 L
EMD Value
₹1.3 L
Closing Date
29 Jun 2026, 3:00 pm
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-05 Ward-04 ke antargat Neebi mukhya sadak se Chak Mirfazal Ali tak hot mix plant dwara sadak nirmaan karya.
2026_NNAMC_1160772_5
29.06.2026 work of 29
Open Tender
Civil Works
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,788
AS PER DOCS
₹1.3 L
16 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 2,025 | cum | 87.3 | ₹1,76,782.5 | BI01010001010000000000000515BI0100001127 |
| 2 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 540 | cum | 1,654.8 | ₹8,93,592 | BI01010001010000000000000515BI0100001107 |
| 3 | P/L of 7.50cm compacted layer of WBM Grade-2 with (45-63) mm ballast and stone screening type -B (dala gritt 11.20mm) including water charge and consolidation all complete of work | 270 | cum | 2,374.2 | ₹6,41,034 | BI01010001010000000000000515BI0100001089 |
| 4 | P/L of 7.50cm compacted layer of WBM Grade-3 with (22.40-53) mm ballast and stone screening type -B (dala gritt 11.20mm) including water charge and consolidation all complete of work | 270 | Cum | 2,896.9 | ₹7,82,163 | BI01010001010000000000000515BI0100001087 |
| 5 | Providing&Applying Primer coat with emulsion at eh rate of 0.60kg/sqm as per mort&H Specification No 502 | 3,600 | sqm | 39.7 | ₹1,42,920 | BI01010001010000000000000515BI0100001085 |
| 6 | Providing&Applying of tack coat at the rate of 0.25kg/sqm includig material laboured all complition of work | 7,200 | cum | 15.3 | ₹1,10,160 | BI01010001010000000000000515BI0100001081 |
| 7 | Providing & Laying D.G.B.M.-50mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumen VG-30 grade bluk @3.40% of weight of mix and including all completion of work as per MORT 7 Hspecification-504 | 180 | cum | 11,335.1 | ₹20,40,318 | BI01010001010000000000000515BI0100001083 |
| 8 | Providing & Laying B.C-30 mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumenC.R.M.B bluk55grade @5.00% of weight of mix and including all completion of work as per MORT & Hspecification-508 | 90 | cum | 12,798.1 | ₹11,51,829 | BI01010001010000000000000515BI0100001079 |
| 9 | Brick edging on both sides of the road of brick class m-150,8cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to require template and in proper alignment and also including dressing &ramming the excavated earth as directed by the engineer incharge of the work including material labour & T&P etc for proper completion of work | 2,400 | cum | 69.16 | ₹1,65,984 | BI01010001010000000000000515BI0100001095 |
| 10 | Providing and laying of hot applied thermoplastic compound 5mm thick including reflectorising glass beads @500gms per sqm area thicknes of 5mm is exclsive of surface applied glass beads as per irc 35-2015 the finished surface to be level uniform. | 300 | Sqm | 618 | ₹1,85,400 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2175520.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid