Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.2 L
EMD Value
₹1,200
Closing Date
16 Jun 2022, 2:00 pmClosed
The superintending Engineer kanchipuram
Kanchipuram
Labour Works contract for Double DT separation under RDSS scheme in respect of North division
2022_EB_235465_1
SE/KEDC/KPM/WC.29/2022-23
Open Tender
Electrical Works
Works
60 days
Kanchipuram
Please refer Tender documents
2 documents required · 2 mandatory
₹0
₹1,200
Yes
21 Jun 2022
9 Jun 2022
17 Jun 2022
9 Jun 2022
16 Jun 2022
9 Jun 2022
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeve concreting
Fixing of HT "V" cross arms
Fixing of Tapping Channel cross arms
Fixing of HT / LT Ti fitting
Fixing of 11 KV strain Disc with M/P
Fixing of 11 KV Pin Insulators with Pin
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Excavation of Pole pit for pole 9.00 m length by using JCB/Manual
Erection of Pole for pole 9.00 m length
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Paving and stringing of conductors of ACSR 7/3.35mm
Paving and stringing of conductors of ACSR 7/3.35mm
Fixing of LT 3 Phase X arm
Fixing of LT SHACKLe with strap set
Fixing of LT Pin Insulator with Pin
Fixing of Aluminimu Knob
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Erection of 11KV Single pole structure with centre support
Loading of DTs and Erection
Dismantling of 100KVA DT
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Stay concreting
Fixing of 11 KV Pin Insulators with Pin
Fixing of 11 KV strain Disc with M/P
Fixing of HT / LT Ti fitting
Fixing of Tapping Channel cross arms
Fixing of HT "V" cross arms
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeve concreting
Excavation of Pole pit for pole 9.00 m length by using JCB/Manual
Erection of Pole for pole above 8.00 m length
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Paving and stringing of conductors of ACSR 7/3.35mm
Transportation of all sizes of conductors from road side to pit locations upto one KM of Conductors
Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of Distribution Transformer / Line materials from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transportation of all sizes of conductors from road side to pit locations upto one KM of Conductors
Paving and stringing of conductors of ACSR 7/2.59 mm
Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of Distribution Transformer / Line materials from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Erection of Pole for pole 8.00 m length
Excavation of Pole for pole 8.00 m length
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeve concreting
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Stay concreting
Fixing of LT 3 Phase X arm
Fixing of Aluminimu Knob
Fixing of LT Pin Insulator with Pin
Fixing of LT shackle with strap set
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Erection of 11KV Single pole structure with centre support
Loading of DTs and Erection
Dismantling of 100KVA DT
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Erection of 11KV Single pole structure with out centre support
Loading of DTs and Erection
Dismantling of 100KVA DT
Paving and stringing of conductors of ACSR 7/3.35mm
Fixing of Tapping Channel cross arms
Fixing of 11 KV strain Disc with M/P
Paving and stringing of conductors of ACSR 7/2.59 mm
Fixing of LT 3 Phase X arm
Fixing of LT shackle with strap set
Fixing of Aluminimu Knob
Dismantling of 100KVA DT
Loading of DTs and Erection
Erection of 11KV Single pole structure with centre support
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Erection of 11KV Single pole structure with out centre support
Loading of DTs and Erection
Dismantling of 100KVA DT
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .