| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹45.9 LAccepted-AOC | ₹45.9 L | L-1 | Accepted-AOC L-1 MP and Co
Lowest Rate |
| 2 | L-2₹46.7 L+₹76,960.03 (1.68%)Rejected-AOC | ₹46.7 L+₹76,960.03 (1.68%) | L-2 | Rejected-AOC L-2 RK Constructions
Highest Rate |
Tender Value
₹46.1 L
EMD Value
₹93,500
Closing Date
3 Jul 2024, 3:00 pmClosed
Project Director
Project Director DRDA-Ranipet
PMGSY Periodic Renewal Incentive Grant 2023-24 L082-AO Road to Kumminipettai Old package No TN26109 and new package no TN26 29R in Nemili Block, Ranipet District
2024_RDTN_134717_1
B3/1773/2024/Date 18.6.2024
Open Tender
CIVIL
Item Rate
120 days
DRDA-Ranipet
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹93,500
10 Sept 2024
18 Jun 2024
3 Jul 2024
18 Jun 2024
3 Jul 2024
18 Jun 2024
Amount
Renewal BT of the Road from L-082 A.O Road to kumminipettai km 0/0 to 3/145 ) Package No:TN 26-29R
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in mini hot mix plant laying at site
Applying tack coat over Existing BT surface using 3kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Hectometer stone
Providing KM Stone
Name board Repainting
Citizen board Repainting
PMGSY Logo Board Repainting
Road Stud with lens Reflector
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
1st Year
2nd Year
3rd Year
4th Year
5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RK Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .