Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
17 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development Officer(BP), Pappireddipatti
The Block Development Office, Pappireddipatti
TN04-02/ Construction of Kitchen Cum store Room (34.70 Sq.m) at Athigarapatti Govt.Hr.Sec School H/O Athigarapatti - Pappireddipatti Block - P02
2026_RDTN_720183_1
TN04 -02 /2026-27 - PAPPIREDDIPATTI BLOCK P02
Open Tender
Civil Works
Item Rate
120 days
The Block Development Office, Pappireddipatti
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹8,440
Yes
20 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Kitchen Cum store Room (34.70 Sq.m) @ Athigarapatti Govt.Hr.Sec School H/O Athigarapatti. | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and list in all clauses as soil as per SS 20 B | 15.9 | Cum | - | - |
| 3 | Supply and Filling the Basement with Local River Sand including cost and Conveyance of all site etc. Complete. | 8.5 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm metal including cost and Conveyance of all site etc. Complete. | 7.97 | Cum | - | - |
| 5 | Refilling the Basement with Excavated earth Other than sand compling the standard Specification. | 8.5 | Cum | - | - |
| 6 | Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete. | 1.88 | Sqm | - | - |
| 7 | Brick work in cm 1:5 Mix using new country bricks including cost and Conveyance of all site etc. complete. | 21.47 | Cum | - | - |
| 8 | Supplying erecting steel centering for lintel, sunshade and Roof slab etc complete
a. Column GB to LL | 11.59 | Sqm | - | - |
| 9 | b. Centering BGL | 28.26 | Sqm | - | - |
| 10 | C. Roof Slab | 66.21 | Sqm | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Techbid2.pdf
Tender Documents • 0.54 MB
Pricebid2.pdf
Additional Documents • 0.36 MB
BOQ_864856.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .