Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92,724.35Admitted-Finance | -21.21% | ₹92,724.35 | L1 | Admitted-Finance |
| 2 | L2₹98,855.76+₹6,131.41 (6.61%)Admitted-Finance | -16.00% | ₹98,855.76+₹6,131.41 (6.61%) | L2 | Admitted-Finance |
| 3 | L3₹99,102.90+₹6,378.55 (6.88%)Admitted-Finance STAKMO | -15.79% | ₹99,102.90+₹6,378.55 (6.88%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 L+₹13,486.75 (14.5%)Admitted-Finance | -9.75% | ₹1.1 L+₹13,486.75 (14.5%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 L
EMD Value
₹2,780
Closing Date
7 May 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Restoration of Edge wall in Inter road Chuchot Shamma RD 3500mtr.(Under Maintenance)
2026_PWD_18722_4
CDL 04 of Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
20 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer Construction Division Leh
₹2,780
13 May 2026
4 May 2026
8 May 2026
4 May 2026
7 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.85 | Cum | 5,730.39 | ₹85,096.29 |
| 2 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 49.5 | Sqm | 486.19 | ₹24,066.41 |
| 3 | Carriage of material from source to site including loading, unloading and stacking complete job. a) Cement and average lead of 05km | 2.01 | MT | 178.8 | ₹359.39 |
| 4 | b) Sand an average lead of 10km | 6.75 | Cum | 271.53 | ₹1,832.83 |
| 5 | c) Stone aggregate an average lead of 10km | 2.2 | Cum | 271.53 | ₹597.37 |
| 6 | d) Stone an average lead of 15km | 14.85 | Cum | 386.07 | ₹5,733.14 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_45058.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .