Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹34,772.07 (20.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹60,880.10 (36.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,700
Closing Date
14 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONST OF FENCING AROUND EIDGAH WITH GATES
2026_RDPR_320038_49
NIT NO 90 OF 2026-27 WAVOORA ADF
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹8,700
21 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
8 Aug 2026 - 8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Laying of cement concrete of specified grade M10(1:3:6) mix crushed stone agg size 20mm | 5.94 | CUM | 5,733.6 | ₹34,057.58 |
| 2 | Brick work with common clay brunt bricks of class designation 75 in foundation and plinth in 1:6 cement mortar | 6.56 | CUM | 7,571.56 | ₹49,669.43 |
| 3 | CENTERING & SHUTTERING INCL REMOVAL OF F WORK | 26.4 | SQMM | 286.35 | ₹7,559.64 |
| 4 | Structral Steel Work In built up Section fixed framed work with or without connecting plates incl cutting hoisting .fixing in postion nd apply a primimg coat all complete | 1,104.97 | kgs | 138.8 | ₹1,53,369.84 |
| 5 | 40mm cooping over brick work in m -15mix | 4.32 | SQM | 510.25 | ₹2,204.28 |
| 6 | PAINTING CHARGE TWO OR MORE COATS | 49.9 | SQM | 131.85 | ₹6,579.32 |
| 7 | carriage of bricks by mt of 145km | 3,116 | nos | 6.61 | ₹20,596.76 |
| 8 | Carriage of material by M/T fine Qty vide , fine Agg average lead 35 km | 8.02 | cum | 465.14 | ₹3,730.42 |
| 9 | Add cost of Photo graphs and Display/gate to be paid as per actual | 1 | NO | 12,000 | ₹12,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1062254.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .