Tender Value
₹21.6 Cr
EMD Value
₹43.3 L
Closing Date
21 Jul 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
SECTION1
20 conditions · 9 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer shall submit Annual Contractual turnover Data for the Previous 3/4 Years (Contractual Payment only) as per Annexure-VI-B
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tender/technical bid will be evaluated based on the bid capacity formula detailed as Annexure-VI
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
(b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing
Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar Nature Work: construction of RCC bridge/ ROB/RUB/LHS. In addition, tenderer (by any partner of JV Or by any partner in case of partnership firm) should have also completed construction of any bridge (minimum size 2.5M x 2.5M) by Box pushing through embankment/Air pushing method/ Box pushing using RH girder technique in same or any other work of any value.
Tenderer has to submit details of Employment/partnership etc of Retired Railway Employees as per Indian Railways Standard General Conditions of Contract- April- 2022 (GCC-April-2022) with all correction slips up-to- date and as given in para 24.1 of "General instructions to tenderer" attached with tender document. Tender without the information above referred to or a statement to the effect that no such retired engineer or retired Gazetted Officer is so associated with the tenderer, as the case may be, shall be rejected. Format given in ANNEXURE-XVII in attached documents.**
21 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It is the responsibility of the tenderer 1. To see corrigendum, if any to tender notice up to the date of tender opening. 2. To keep him self updated about any latest Railway Board Circulars up to the date of tender opening.
For those conditions for which standard formats have been given in the uploaded documents for providing information, it should only be submitted in these standard formats.
Postal address of Office: Office of the Dy. Chief Engineer/Construction/PRYJ, Ground Floor, H- Block, Baghirathi Building, GM office complex, Subedarganj, Prayagraj (Uttar Pradesh) 211015 Mobile Number: 9794835217 & Email: [email protected]
Tenderers are advised to go through the 'SPECIAL CONDITIONS' thoroughly which are incorporated in tender document before quoting the rates.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
All required document duly Signed in ink by the Tenderer and shall be uploaded. The same person shall submit the bid who has signed all the documents to be uploaded
Construction of Limited Height Subway at Level crossing no 415B (Shankargarh Yard) and other connected works.
CEN-2026-27-05
CEN-2026-27-05
Open
Works - General
15 Months
Prayagraj, Uttar Pradesh
₹0
₹43.3 L
29 Jun 2026
29 Jun 2026
7 Jul 2026
209 items across 2 schedules · ₹20,40,06,689.78 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 1 | Using Soil Class SQ1 | cum | 1200.00 | 281.85 | 3,38,220 |
| 2 | Using Soil Class SQ2 | cum | 1200.00 | 318.74 | 3,82,488 |
| Felling trees of girth (measured at a height of 1.0 m above ground level) including leading and stacking of material within 100m. Note : 1. When stumps are grubbed up in addition, the rates shall be doubled for trees cut and grubbed 2. Payment for grubbing shall only be made where specially ordered. 3. Grubbing shall be ordered only where it is essential to remove the stumps, including the roots, as per specification. 4. Grubbing shall include removal of roots of trees and saplings to a depth of 60cm below ground level or 30 cm below formation level or 15 cm below sub grade level, whichever is lower. | — | — | — | — | |
| 3 | Girth over 30 cm and up to 60 cm | Each | 5.00 | 325.79 | 1,628.95 |
| 4 | Girth over 60 cm and up to 1.5m | Each | 8.00 | 900.16 | 7,201.28 |
| P r o v i d i n g portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. | — | — | — | — | |
| 5 | With provision of one 50mm wide retro- reflective tape in horizontal direction, duly secured/tight with vertical posts. | Metre | 1200.00 | 237.69 | 2,85,228 |
| 6 | Shoring with 'Z' section MS sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. | Sqm | 400.00 | 908.27 | 3,63,308 |
| Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area. | — | — | — | — | |
| 7 | 0m to 10m | Metre | 30.00 | 1,224.75 | 36,742.5 |
| Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing water with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR. | — | — | — | — | |
| 8 | 0m to 10m | Metre | 10.00 | 1,469.7 | 14,697 |
| Drilling of NX size borehole (75mm dia.) in all types of hard rock and collection of rock core samples from boreholes and preserving in boxes. | — | — | — | — | |
| 9 | 0m to 10m | Metre | 30.00 | 3,450.63 | 1,03,518.9 |
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 10 | All kinds of soils | cum | 15800.00 | 196.66 | 31,07,228 |
| 11 | Soft rock (not requiring blasting) | cum | 250.00 | 405.35 | 1,01,337.5 |
| 12 | Hard rock (blasting prohibited ) | cum | 400.00 | 1,114.41 | 4,45,764 |
| 13 | P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 2500.00 | 3,645.58 | 91,13,950 |
| P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | — | |
| 14 | Wing wall and Return wall | cum | 150.00 | 3,725.25 | 5,58,787.5 |
| 15 | Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. | cum | 450.00 | 3,722.48 | 16,75,116 |
| 16 | Providing and casting machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 2500.00 | 4,010.14 | 1,00,25,350 |
| Centering and shuttering including strutting, propping etc. and removal of form for : | — | — | — | — | |
| 17 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 7000.00 | 661.48 | 46,30,360 |
| 18 | All types of bridge super-structures, e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level. | Sqm | 700.00 | 860.71 | 6,02,497 |
| 19 | Extra for additional height over item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. | Sqm | 2000.00 | 106.15 | 2,12,300 |
| Supply and using Cement at Worksite | — | — | — | — | |
| 20 | Ordinary Portland Cement 43 grade approved brands/makes | MT | 2000.00 | 8,153.06 | 1,63,06,120 |
| 21 | Pozzolana Portland Cement approved brands/makes | MT | 50.00 | 7,107.79 | 3,55,389.5 |
| Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | — | — | — | — | |
| 22 | Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes. | Kg | 570000.00 | 80.14 | 4,56,79,800 |
| 23 | Extra for using GI Drag Sheet, 1.50 mm t h i c k , for protection of t r a c k from subsidence while pushing the box as per design over item no. 031120. Note: The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. | cum | 1200.00 | 757.54 | 9,09,048 |
| 24 | Casting and installation of single/twin RCC box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. | cum | 3000.00 | 3,239.15 | 97,17,450 |
| 25 | Fabrication, insertion and removal of rail cluster below the running track to ensure safety of track during box pushing in correct position and alignment with Railway rails and contractors MS flats, wooden blocks, and 12 mm dia bolts etc., as per approved drawing including removing and filling back of ballast below track under traffic conditions of Electrified/Non-Electrified section with all contractors, labour, tools, tackles, consumables plants, and 50MT capacity crane and any other material required for execution of work in all respect with all lead and lift, transportation and as directed by Engineer in-charge. Payment quantity shall be as per the weight of rail in rail cluster used at site or as per approved drawing, whichever is minimum. | MT | 40.00 | 4,243.26 | 1,69,730.4 |
| Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms. | — | — | — | — | |
| 26 | Up to 5.00 Km | MT | 225.00 | 82.12 | 18,477 |
| 27 | Above 5 km up to 10 km | MT | 225.00 | 117.21 | 26,372.25 |
| 28 | Above 10 km up to 15 km | MT | 225.00 | 148.62 | 33,439.5 |
| 29 | Above 15 km up to 20 km | MT | 225.00 | 177.45 | 39,926.25 |
| 30 | Above 20 km up to 25 km | MT | 225.00 | 204.41 | 45,992.25 |
| 31 | Above 25 km up to 30 km | MT | 225.00 | 229.96 | 51,741 |
| 32 | Above 30 km up to 35 km | MT | 225.00 | 254.43 | 57,246.75 |
| 33 | Above 35 km up to 40 km | MT | 225.00 | 278.05 | 62,561.25 |
| 34 | Above 40 km up to 60 km | MT | 225.00 | 332.2 | 74,745 |
| Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms. | — | — | — | — | |
| 35 | Above 60 km up to 80 km | MT | 225.00 | 417.38 | 93,910.5 |
| 36 | Above 80 km up to 100 km | MT | 225.00 | 500.71 | 1,12,659.75 |
| 37 | Above 100 km up to 150 km | MT | 225.00 | 670.17 | 1,50,788.25 |
| 38 | Above 150 km up to 200 km | MT | 225.00 | 914.8 | 2,05,830 |
| 39 | Above 200 km | MT-Km | 225.00 | 4.97 | 1,118.25 |
| Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20% | — | — | — | — | |
| 40 | Plate Girder/Semi Through Girder/Composite Girder (Steel Work) | MT | 60.00 | 1,00,144.26 | 60,08,655.6 |
| 41 | Supplying and fixing HSFG bolts of any dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 f o r bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete. | Kg | 4000.00 | 169.56 | 6,78,240 |
| Providing and fixing various size HTS holding down bolts conforming to relevant Codes/Specification in concrete c o l u m n or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job. | — | — | — | — | |
| 42 | With Cement Grout. Cost of cement shall be paid extra. | Kg | 3500.00 | 127.5 | 4,46,250 |
| 43 | Supplying fabricating and erecting welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per s p e c ifi c a t io n and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. | MT | 50.00 | 87,491.62 | 43,74,581 |
| 44 | Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | cum | 300.00 | 1,274 | 3,82,200 |
| Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra). | — | — | — | — | |
| 45 | Neat Cement Grout with 20% anti shrinkage compound w.r.t. cement. | Kg | 800.00 | 356.84 | 2,85,472 |
| 46 | Epoxy Grout | Kg | 200.00 | 1,349.02 | 2,69,804 |
| 47 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 400.00 | 45.37 | 18,148 |
| Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only. | — | — | — | — | |
| 48 | On Cess | Each | 20.00 | 313.47 | 6,269.4 |
| 49 | In-situ situation | Each | 10.00 | 455.33 | 4,553.3 |
| Drilling of hole of different diameter and chamfering, in rail of any section and any UTS manually only in emergencies with contractor's labours, tools & plants, consumables etc. | — | — | — | — | |
| 50 | Hole of dia. 26.5mm and above | Each | 30.00 | 248.1 | 7,443 |
| Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : | — | — | — | — | |
| 51 | Rail section of 52Kg and above | Each | 30.00 | 106.31 | 3,189.3 |
| Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by Engineer-in- charge. Note: Payment shall be made based on ballast stack measurement. | — | — | — | — | |
| 52 | For average lead up to 50m and lift up to 5m | cum | 130.00 | 95.52 | 12,417.6 |
| 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | — | — | — | — | |
| 53 | For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Thimble , 3 pieces Mould (Zircon washed) and Compressed Air Petrol/LPG pre heating technique | Each | 40.00 | 1,832.39 | 73,295.6 |
| Insertion of temporary girder in place of formation involving dismantling of track, removal of ballast and neatly stacking for future use, excavation & installation of CC crib or wooden crib at both ends as per approved design in one or more traffic blocks, excavation for creating space for insertion of girder as required, placement of girder by contractor's Crane, tools & plants, filling of earth/sand filled bags at different stages as required, linking of track and connecting with the approaches, ballasting, boxing and packing approach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge. Note: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. 2. Transportation of Temporary Girder to site shall be paid separately under relevant item. 3. The charges for wooden sleepers/blocks required for matting and bearing as per approved design shall be paid extra as per relevant item. 4. In case bridge timber / channel sleepers are required to be laid on girder, the same shall be paid separately under relevant item. | — | — | — | — | |
| 54 | RH /Temporary girder of length above 16.3m and up to 26.00 using Road crane capacity of 80 MT | Each | 4.00 | 78,951.88 | 3,15,807.52 |
| 55 | Manufacturing and using wooden sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. | cum | 10.00 | 1,828.86 | 18,288.6 |
| Removal of temporary girder, crib on both ends and placing temporary girder on crib / cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 kmph speed, boxing & dressing of cess, ballast profiling etc. Note: If earth is to be brought by contractor from outside, the same will be paid separately. | — | — | — | — | |
| 56 | RH /Temporary girder of length above 16.3m and up to 26.00 using Road crane capacity of 80 MT | Each | 4.00 | 91,138.82 | 3,64,555.28 |
| 57 | Inserting in track Steel Channel/H-beam sleepers with all Railway supplied fittings complete for TBTR work to specified gauge under traffic block with contractor's tools including aligning, levelling to make track fit for 20 kmph speed and as directed by Engineer in- charge. Note: Transportation of track material if supplied beyond 250m of bridge approaches, shall be paid separately under relevant item. | Each | 180.00 | 301.85 | 54,333 |
| 58 | Tightening of steel channel sleeper fittings i.e. hook bolts, running rails bolts, guard rail bolts on girder bridges with contractor labour tools, plants etc., including oiling, greasing of fittings complete and as directed by engineer in charge. Note: Before execution of work specific approval of ADEN to be obtained by duly indicating the locations with specific reasons along with date of last tightening done. | Sleeper | 180.00 | 35.85 | 6,453 |
| 59 | Manufacture & supply of a set of 2 Nos of Elastomeric Pads 25mm / 30mm thick and 4 nos of Grooved rubber pads as per RDSO drawing No. B/1636/5 alt 2 to suit Insulated H Beam sleepers from RDSO approved sources with all contractor's material, lead, lift, labour, tools, plant and transportation etc. complete as per approved drawings and as instructed by Engineer in-charge. Note: One Set consists of 2 nos. Elastomeric Pad 25mm/30mm and 4 nos. Grooved Rubber Pad. | Set | 180.00 | 2,311.59 | 4,16,086.2 |
| Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro- reflective sheeting conforming to type- IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. | — | — | — | — | |
| 60 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 5.00 | 6,066.05 | 30,330.25 |
| 61 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 5.00 | 5,128.99 | 25,644.95 |
| 62 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 10.00 | 7,723.13 | 77,231.3 |
| Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed. | — | — | — | — | |
| 63 | For erection | Each | 50.00 | 237.68 | 11,884 |
| 64 | For removal | Each | 50.00 | 192.8 | 9,640 |
| 65 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 300.00 | 651.58 | 1,95,474 |
| 66 | Supply, filling and stacking of sand bags layer by layer filled with Railway Sand/railway quarry dust in Contractor's empty polythene cement bags of 50 kg bags with all contractors labour, tools, plants, lead, lift etc., including stitching the same with machine using polythene thread complete as directed by Engineer-in charge at site. | Each | 5000.00 | 14.12 | 70,600 |
| Schedule total | ₹12,02,84,915.43 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
New IRPWM up to CS 16
ATTACHMENT
Tender Document
ATTACHMENT
GCC-2022-ACS101_compressed.pdf
ATTACHMENT
PCEsSafelyCircularNo.103Revised.pdf PCE Safely Circular No 103
ATTACHMENT
E MB implementation
ATTACHMENT
RBletteronAnnexureV.pdf
ATTACHMENT
RHgirdercondition.pdf
ATTACHMENT
SpecialConditionforAIRPUSHING.pdf
ATTACHMENT
PCEsSafelyCircularNo.103Revised.pdf
ATTACHMENT
ImplementationofContractore-MeasurementBook.pdf
ATTACHMENT
NEWIRPWMCORRECTEDUPTOACS-16_compressed.pdf
ATTACHMENT
FinalTenderDocumentCEN-2026-27-05.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .