| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC | ₹6.0 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC Quoted lowest rate |
| 2 | L2₹2.7 Cr+₹15.0 L (5.81%)Rejected-AOC | ₹2.7 Cr+₹15.0 L (5.81%) | L2 | Rejected-AOC Not quoted lowest rate |
| 3 | L3₹2.8 Cr+₹21.4 L (8.27%)Rejected-AOC | ₹2.8 Cr+₹21.4 L (8.27%) | L3 | Rejected-AOC Not quoted lowest rate |
| 4 | L4₹4.0 Cr+₹1.4 Cr (54.0%)Rejected-AOC | ₹4.0 Cr+₹1.4 Cr (54.0%) | L4 | Rejected-AOC Not quoted lowest rate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non complying of BQR |
Tender Value
₹10.6 Cr
EMD Value
₹26.4 L
Closing Date
6 Nov 2024, 11:00 amClosed
The Superintending Engineer-MP and ORs
Electricity Department, No.137, Subash Chandra Bose Salai, Puducherry - 605 001
Repairing and Supply of Spares for 250 Nos. (Approx) of 22KV and 30 Nos. (Approx) of 11KV sick Distribution Transformers of various capacities in Electricity Department, Puducherry
2024_EDCC_16765_1
e.No.09/ED/EE-SPM and Bldgs./2024-2025
Open Tender
Electrical Works
Works
365 days
Head office, Electricity Department
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,770
Yes
The Executive Engineer-SPM and Buildings, PED
₹26.4 L
Yes
9 Apr 2025
22 Oct 2024
6 Nov 2024
22 Oct 2024
6 Nov 2024
22 Oct 2024
22 Oct 2024 - 6 Nov 2024
HV Coil SE Copper / Kg for 22KV / 100 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 100 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 100 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 100 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 100 KVA
Breather for 22KV / 100 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 100 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 100 KVA
C.R.G.O Lamination for 22KV / 100 KVA
Radiator Fins for 22KV / 100 KVA
Tap switch Assembly for 22KV / 100 KVA
Inter coil Insulation per limb for 22KV / 100 KVA
Re-insulation of L.V. Coils for 22KV / 100 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 100 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 100 KVA
Gasket for tank cover / Transformer for 22KV / 100 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 100 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 100 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 100 KVA
Electrical connections: Star Connection for 22KV / 100 KVA
Electrical connections : Delta Connection for 22KV / 100 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 100 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 100 KVA
Charges for hot oil circulation after filling for 22KV / 100 KVA
Drying out of the repaired core after assembling the coils for 22KV / 100 KVA
Welding per cm for 22KV / 100 KVA
Total amount for repairing of 1 No. of 22KV, 100KVA sick Distribution Transformer
Total amount for repairing of 25 Nos. of 22KV, 100KVA sick Distribution Transformer (A)
HV Coil SE Copper / Kg for 22KV / 200 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 200 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 200 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 200 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 200 KVA
Breather for 22KV / 200 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 200 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 200 KVA
C.R.G.O Lamination for 22KV / 200 KVA
Radiator Fins for 22KV / 200 KVA
Tap switch Assembly for 22KV / 200 KVA
Inter coil Insulation per limb for 22KV / 200 KVA
Re-insulation of L.V. Coils for 22KV / 200 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 200 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 200 KVA
Gasket for tank cover / Transformer for 22KV / 200 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 200 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 200 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 200 KVA
Electrical connections: Star Connection for 22KV / 200 KVA
Electrical connections : Delta Connection for 22KV / 200 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 200 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 200 KVA
Charges for hot oil circulation after filling for 22KV / 200 KVA
Drying out of the repaired core after assembling the coils for 22KV / 200 KVA
Welding per cm for 22KV / 200 KVA
Total amount for repairing of 1 No. of 22KV, 200KVA sick Distribution Transformer
Total amount for repairing of 120 Nos. of 22KV, 200KVA sick Distribution Transformer (B)
HV Coil SE Copper / Kg for 22KV / 315 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 315 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 315 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 315 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 315 KVA
Breather for 22KV / 315 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 315 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 315 KVA
C.R.G.O Lamination for 22KV / 315 KVA
Radiator Fins for 22KV / 315 KVA
Tap switch Assembly for 22KV / 315 KVA
Inter coil Insulation per limb for 22KV / 315 KVA
Re-insulation of L.V. Coils for 22KV / 315 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 315 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 315 KVA
Gasket for tank cover / Transformer for 22KV / 315 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 315 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 315 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 315 KVA
Electrical connections: Star Connection for 22KV / 315 KVA
Electrical connections : Delta Connection for 22KV / 315 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 315 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 315 KVA
Charges for hot oil circulation after filling for 22KV / 315 KVA
Drying out of the repaired core after assembling the coils for 22KV / 315 KVA
Welding per cm for 22KV / 315 KVA
Total amount for repairing of 1 No. of 22KV, 315KVA sick Distribution Transformer
Total amount for repairing of 100 Nos. of 22KV, 315KVA sick Distribution Transformer (C)
HV Coil SE Copper / Kg for 22KV / 500 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 500 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 500 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 500 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 500 KVA
Breather for 22KV / 500 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 500 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 500 KVA
C.R.G.O Lamination for 22KV / 500 KVA
Radiator Fins for 22KV / 500 KVA
Tap switch Assembly for 22KV / 500 KVA
Inter coil Insulation per limb for 22KV / 500 KVA
Re-insulation of L.V. Coils for 22KV / 500 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 500 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 500 KVA
Gasket for tank cover / Transformer for 22KV / 500 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 500 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 500 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 500 KVA
Electrical connections: Star Connection for 22KV / 500 KVA
Electrical connections : Delta Connection for 22KV / 500 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 500 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 500 KVA
Charges for hot oil circulation after filling for 22KV / 500 KVA
Drying out of the repaired core after assembling the coils for 22KV / 500 KVA
Welding per cm for 22KV / 500 KVA
Total amount for repairing of 1 No. of 22KV, 500KVA sick Distribution Transformer
Total amount for repairing of 5 Nos. of 22KV, 500KVA sick Distribution Transformer (D)
Total amount for repairing 250 Nos. (Approx) of 22 KV sick Distribution Transformers (A+B+C+D)
HV Coil SE Copper / Kg for 11KV /200 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV / 200 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV /200 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV /200 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV /200 KVA
Breather for 11KV /200 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV /200 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV / 200 KVA
C.R.G.O Lamination for 11KV /200 KVA
Radiator Fins for 11KV /200 KVA
Tap switch Assembly for 11KV /200 KVA
Inter coil Insulation per limb for 11KV /200 KVA
Re-insulation of L.V. Coils for 11KV /200 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV /200 KVA
Gray Paint for outer side of Distribution Transformer for 11KV /200 KVA
Gasket for tank cover / Transformer for 11KV / 200 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV /200 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV /200 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV /200 KVA
Electrical connections: Star Connection for 11KV /200 KVA
Electrical connections : Delta Connection for 11KV /200 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV /200 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 11KV /200 KVA
Charges for hot oil circulation after filling for 11KV /200 KVA
Drying out of the repaired core after assembling the coils for 11KV /200 KVA
Welding per cm for 11KV /200 KVA
Total amount for repairing of 1 No. of 11KV, 200KVA sick Distribution Transformer
Total amount for repairing of 15 Nos. of 11KV, 200KVA sick Distribution Transformer (E)
HV Coil SE Copper / Kg for 11KV / 315 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV /315 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV /315 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV / 315 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV / 315 KVA
Breather for 11KV / 315 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV / 315 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV / 315 KVA
C.R.G.O Lamination for 11KV / 315 KVA
Radiator Fins for 11KV / 315 KVA
Tap swtich Assembly for 11KV / 315 KVA
Inter coil Insulation per limb for 11KV / 315 KVA
Re-insulation of L.V. Coils for 11KV /315 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV / 315 KVA
Gray Paint for outer side of Distribution Transformer for 11KV / 315 KVA
Gasket for tank cover / Transformer for 11KV /315 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV / 315 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV / 315 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV / 315 KVA
Electrical connections: Star Connection for 11KV / 315 KVA
Electrical connections : Delta Connection for 11KV /315 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV / 315 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 315 KVA
Charges for hot oil circulation after filling for 11KV / 315 KVA
Drying out of the repaired core after assembling the coils for 11KV / 315 KVA
Welding per cm for 11KV / 315 KVA
Total amount for repairing of 1 No. of 11KV, 315KVA sick Distribution Transformer
Total amount for repairing of 15 Nos. of 11KV, 315KVA sick Distribution Transformer (F)
Total amount for repairing 30 Nos. (Approx) of 11 KV sick Distribution Transformers (E+F)
Unit Rate Total
SRI VALAMPURI TRANSFORMERS (BID ID -52655)
SAKTHI TRANSFORMERS (BID ID -52621)
VISHNU ELECTRICALS (BID ID -52574)
Bidder Name
BALA INDUSTRIES
SAKTHI TRANSFORMERS
SRI VALAMPURI TRANSFORMERS
VISHNU ELECTRICALS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_17100.xls
BOQ Document • 0.37 MB
154839429.pdf
Tender Document • 0.15 MB
General_conditions.pdf
Tender Document • 0.82 MB
Technical_specification.pdf
Tender Document • 0.41 MB
Schedules.pdf
Tender Document • 0.37 MB
154839431.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .