| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC AT P O KHUKURDAHA P S DASPUR DIST PASCHIM MEDINIPUR | KHUKURDAHA | PASCHIM MEDINIPUR | WEST BENGAL | ₹19.1 L | L1 | Accepted-AOC Award of Contract given to PRASENJIT MAJI as been Lowest |
| 2 | L2₹19.3 LRejected-Finance BOXIBAZAR P O MIDNAPORE DIST PASCHIM MEDINIPUR PIN 721101 | MIDNAPORE | PASCHIM MEDINIPUR | WEST BENGAL | 721101 | ₹19.3 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹19.5 LRejected-Finance BOXIBAZAR DIST PASCHIM MEDINIPUR PIN 721101 | BOXIBAZAR | PASCHIM MEDINIPUR | WEST BENGAL | 721101 | ₹19.5 L | L3 | Rejected-Finance Not Lowest |
Tender Value
₹18.6 L
EMD Value
₹37,152
Closing Date
17 Jul 2026, 5:00 pmClosed
EE/West Midnapore Division
Office of the Executive Engineer West Midnapore Division Sekhpura, Midnapore, Paschim Medinipur
Urgent protection and mitigation work to reduce vulnerability of people by repairing of Subsidence Slip 135 M at Mohanchak on Right Ex Zamindary Embankment of Katan Khal occured due to drawdown of drainage channel water at Mouza Mohanchak
2026_IWD_1032086_1
WBIW/EE/WMD/eSNIT-04/2026-27
Open Tender
CIVIL WORKS
Percentage
21 days
Ghatal
Please refer Tender documents.
6 documents required · 6 mandatory
₹37,152
Yes
22 Aug 2026
14 Jul 2026
17 Jul 2026
14 Jul 2026
17 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(iii) 15 cm av. diameter | - | Metre | 258.62 | - |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(iii) 15 cm av. diameter | - | Metre | 125.14 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
b) Width of thinner end above 10 cm & up to 15 cm.
(i) Jhaw / Eucalyptus. | - | Metre | 123.95 | - |
| 4 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | - | Metre | 34.56 | - |
| 5 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Metre | 13.11 | - |
| 6 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Metre | 26.22 | - |
| 7 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | - | Each | 139.44 | - |
| 8 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3
.Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary. | - | Each | 498.17 | - |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each Bag | 7.15 | - |
| 10 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | - | Each Bag | 8.34 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
Tendernotice_2.pdf
PDF • 0.99 MB
Tendernotice_3.pdf
PDF • 0.71 MB
Tendernotice_4.pdf
PDF • 0.73 MB
BOQ_2534411.xls
BOQ • 0.32 MB
Corrigendum_1.pdf
PDF • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].