Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | L1 | Accepted-Finance Being L1 the bidder is accepted | |
| 2 | L2₹9.0 L+₹32,385 (3.73%)Rejected-Finance | L2 | Rejected-Finance Being L2 the bidder is rejected | |
| 3 | L3₹9.1 L+₹42,700 (4.92%)Rejected-Finance | L3 | Rejected-Finance Being L3 the bidder is rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Not qualified |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
25 Dec 2020, 6:00 pmClosed
Executive Engineer REW Jammu
Office of the Executive Engineer REW Jammu
Construction of Community Hall at Sari RakhwalaN Pyt sari Block Marh
2020_RDPR_111402_1
e NIT No 36 REWJ of 2020 dated 12-12-2020
Open Tender
Civil Works
Item Rate
90 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer REW Jammu
₹20,000
7 Jan 2021
12 Dec 2020
26 Dec 2020
12 Dec 2020
25 Dec 2020
12 Dec 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil including all lead lift and carriage complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all lead lift and carriage complete
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all lead lift and carriage complete
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded crushed stone aggregate 20mm nominal size) plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. including all lead lift and carriage complete
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all Cold twisted bars complete
Centring and shuttermg including strutting, propping etc. and removal of form for· Columns, Pillars, Piers, Abutments, Posts and Struts
Centring and shuttermg including strutting, propping etc. Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and shuttermg including strutting, propping etc. and removal of form for· Suspended floors, roofs, landings, balconies and access platform
M/S JAI DEV CONTRACTOR
Ram Pal Sharma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .