Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrAccepted-AOC 26 10B KRISHNAPURAM KADAIYANALLUR TENKASI TALUK TENKASI 627 759 | TENKASI | TAMIL NADU | 627759 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.7 Cr+₹1.2 Cr (8.01%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | MADURAI | TAMIL NADU | 625020 | L2 | Rejected-Finance High Quoted | |
| 3 | Rejected-Technical NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | - | Rejected-Technical Not Complied with Prequalification |
Tender Value
₹14.6 Cr
EMD Value
₹7.4 L
Closing Date
19 Dec 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Forming foot path and providing basic amenities to the pilgrimsof Irukkankudi Mariamman Temple in km 6 0 9 0 of Sattur Nenmeni Nagalapuram road. TNV84
2022_HWAY_265063_1
TN No 25 2022 23 D1 Dated 08.11 2022
Open Tender
Civil Works - Highways
Percentage
330 days
Sattur
Ave Annual Turnover
Completed Contracts
Minimum quities of works comple in 1yr during the last 5yrs
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for the last 5yrs
Litigation history
Bid capacity
9 documents required · 9 mandatory
₹0
₹7.4 L
15 Apr 2023
17 Nov 2022
20 Dec 2022
17 Nov 2022
19 Dec 2022
30 Nov 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Embankment Cutting | - | - | - | - |
| 2 | Road A (Footpath Paver) | 3,022 | Cubic Metre | 106.25 | ₹3,21,087.5 |
| 3 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,
complete as per standard specification for embankment with CBR of 8. | - | - | - | - |
| 4 | Road A (Footpath Paver) | 25,691 | Cubic Metre | 227.56 | ₹58,46,243.96 |
| 5 | Plain Cement Concrete M15 grade, Nominal Mix 1:2:4 using 40 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for CC pavement in B/w 80mm Paverblock & Kerb wall to Drain off the water | - | - | - | - |
| 6 | Road A (Footpath Paver) | 63.5 | Cubic Metre | 5,739.18 | ₹3,64,437.93 |
| 7 | Cement Concrete kerb of M20 grade, Nominal Mix 1:1:5:3 using 20mm ISS size with top and bottom width 150 mm and 200mm respectively,300mm high and foundation of 150 mm thick and kerb stone laid with kerb laying machine and foundation concrete laid manually cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Bodywall of Kerb wall. | - | - | - | - |
| 8 | Road A (Footpath Paver) | 4,639.3 | Running Meter | 416.2 | ₹19,30,876.66 |
| 9 | Reinforced Cement Concrete drain (base slab of size 3.5 m x 0.70 m x 0.20 m,side walls of size 3.5 m x 0.3m x 0.20 m and side wall projection of size 3.5m x 0.10m x 0.10 m and 4 Nos of cover slab of size of 0.875m x 0.5m) with nominal reinforcement) using M20 grade, Nominal Mix 1:2:4 using 20 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Cross drainage across foot path | - | - | - | - |
| 10 | Road A (Footpath Paver) | 121 | Numbers | 16,058.21 | ₹19,43,043.41 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_314043.xls
BOQ Document • 0.52 MB
109047864.pdf
Tender Document • 0.08 MB
PQ.pdf
Tender Document • 0.41 MB
PB.pdf
Tender Document • 0.77 MB
109047866.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .