| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance as per quote |
| 2 | L2₹1.7 CrRejected-Finance | ₹1.7 Cr | L2 | Rejected-Finance as per quote |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
14 Aug 2026, 1:30 pmClosed
Superidending Engineer
Khaipar Banda
Construction of upgradation Government Intermediat at Chandi Block Rajapur Distt Chitrakoot under scheme Samagra Siksha 2025-26
2026_SCIDC_1174022_1
49/SE/e-Tender/Cktd/2026-27 Dt 01-08-2026
Open Tender
Civil Works
Percentage
270 days
Chitrakoot
Construction of upgradation Government Intermediat at Chandi Block Rajapur Distt Chitrakoot under scheme Samagra Siksha 2025-26
2 documents required · 2 mandatory
₹3,540
UPSCIDCO
₹3.4 L
SE Office Chitrakootdham Mandal Banda
19 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Main Building
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m all kind of soil | 37.92 | Cum | 180.06 | ₹6,827.88 |
| 2 | providing driving with hydaulic pilling righ with power units and installing driven cast-b-situ reinforced cement concrete piles of grade M5 of specified diameter and length below the pile cap, to carry safe working load not less them specified. Of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) 300mm dia | 714 | Cum | 2,120.55 | ₹15,14,072.7 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 423.26 | Cum | 484.55 | ₹2,05,090.63 |
| 4 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 87.49 | Cum | 4,712.03 | ₹4,12,255.5 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 101.92 | Cum | 1,469.05 | ₹1,49,725.58 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) Footing | 15.78 | Cum | 6,257.17 | ₹98,738.14 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | 37.6 | Cum | 4,933.55 | ₹1,85,501.48 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) Plinth Beam | 45.92 | Cum | 6,257.17 | ₹2,87,329.25 |
| 9 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,068.59 | Sqm | 214.47 | ₹2,29,180.5 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Coloumn | 12.87 | Cum | 7,320.48 | ₹94,214.58 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.75 MB
Tendernotice_2.pdf
PDF • 8.22 MB
BOQ_2205619.xls
BOQ • 0.51 MB
BoQICChandiCHK.pdf
Additional Documents • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].