| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.4 LAccepted-AOC OFFICE NO 101 MALAN PLAZA NEXT TO ESSAR PETROL PUMP NEAR GODAMBLE CORNER RAHATNI PIMPRI DP ROAD RAHATANI PUNE 411 017 | PUNE | PUNE | MAHARASHTRA | 411017 | L1 | Accepted-AOC Being overall reasonable | |
| 2 | L2₹43.9 L+₹1.1 L (2.68%)Rejected-Finance | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹45.9 L+₹3.1 L (7.22%)Rejected-Finance | L3 | Rejected-Finance Not lowest bidder | |
| 4 | L4₹46.9 L+₹4.1 L (9.61%)Rejected-Finance GATE NO 454 01 TAPKIR NAGAR PUNE NASIK HIGHWAY NEAR GANDHARV NAGARI MOSHI PUNE 412 105 | PUNE | MAHARASHTRA | 412105 | L4 | Rejected-Finance Not lowest bidder | |
| 5 | L5₹47.0 L+₹4.2 L (9.86%)Rejected-Finance | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | M/S. Niksun Electro-Infra Private Limited L1 | Om Construction L3 | UNIQUE ENGINEERS L7 | ONKAR ELECTRIC AND GENERAL STORE L4 | T.H.ASSOCIATES L6 | TULAJA ENTERPRISES L2 | Zenex Engineers L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repairs/overhauling of LT air circuit breakers of any make with cap 1200 to 1600 Amps and replacement of minor items like springs, washers, bolt/nuts & washers and other insulating materials etc and also including calibration and testing of control and protection devices of equipments in the following steps all as specified and as directed.
(i) Disconnecting and taking out the breaker after taking shut down of the respective panel/tapping point and check the defects.
(ii) Overhauling the ACB by opening all parts and lubricating the moving parts as per requirement.
(iii) Re-assembling the air circuit breaker complete, install at it's original position, testing and commissioning the breakers for both mode as tripping mechanism and closing mechanism for proper functioning of the breaker all as specified and as directed. | 30 | Each Job | 4,500 ₹1,35,000 | 3,858 ₹1,15,740 Lowest | 3,919 ₹1,17,570 | 3,939 ₹1,18,170 | 4,000 ₹1,20,000 | 5,000 ₹1,50,000 | 3,899 ₹1,16,970 |
| 2.00 | Description all as per Item S. No-1 above but capacity of 630 to 1000 Amps | 38 | Each Job | 4,000 ₹1,52,000 | 2,295 ₹87,210 Lowest | 2,331 ₹88,578 | 2,344 ₹89,072 | 2,400 ₹91,200 | 5,000 ₹1,90,000 | 2,319 ₹88,122 |
| 3.00 | Material and labour for Isolate/de-energize the supply of LT Panel Board of capacity 200 Amps to 1600 Amps and voltage 415 Volts/230 Volts, opening the doors/covers of the cubicle enclosure for carrying out the servicing / maintenance / repairs of the Panel Board, switch gear, metering fixures etc and re-fixing the same at it's place after following repairs/check for smooth functioning complete all as specified and as directed.
NOTE :-
a) Cleaning the inside switch gear chambers for removing dust and carbon including cleaning with the help of blower and apply insulating varnish.
b) Check the condition of the support insulators including cleaning applying Dr beck red for better IR values and replacement of support insulators if required and as directed by Engr-in-Charge.
c) Tightening up of all bus bar connections, cable connections, replace nut/bolts & washers wherever required. | 60 | Each Job | 1,500 ₹90,000 Lowest | 4,584 ₹2,75,040 | 4,656 ₹2,79,360 | 4,680 ₹2,80,800 | 4,800 ₹2,88,000 | 3,000 ₹1,80,000 | 4,632 ₹2,77,920 |
| 4.00 | Material and labour for disconnecting and taking down the existing bus bars of 4 wire system of cap 200 Amps to 1600 Amps from LT panel board any type and cleaning with CTC applying with becktol solution, removing old insulation and providing new heat shrink insulating sleeves, connecting and fixing at it's place with new/existing nuts, bolts and washers of suitable size complete all as specified and as directed. | 60 | Each Panel | 2,000 ₹1,20,000 | 5,767 ₹3,46,020 | 5,859 ₹3,51,540 | 5,889 ₹3,53,340 | 6,500 ₹3,90,000 | 1,800 ₹1,08,000 Lowest | 5,828 ₹3,49,680 |
| 5.00 | Material and labour disconnecting and taking out old existing burnt/worn out control wiring connections as per requirement incl cable lugs, glands of LT panel board of 4 wire system of cap 200 Amps to 1600 Amps and replace with new cable PVC insulated, stranded copper conductor size as per existing incl lugs, glands, nuts, bolts & washers complete all as specified and as directed. | 60 | Each Panel | 1,500 ₹90,000 Lowest | 5,254 ₹3,15,240 | 5,336 ₹3,20,160 | 5,364 ₹3,21,840 | 5,600 ₹3,36,000 | 1,800 ₹1,08,000 | 5,309 ₹3,18,540 |
| 6.00 | Material and labour for disconnecting and taking out old existing worn out cable lugs, nuts, bolts, washers etc from LT panel board of 4 wire system of cap 200 Amps to 1600 Amps (incomming and outgoing) and supply and connect with new aluminium lugs and nuts, bolts, washers etc complete all as specified and as directed. | 60 | Each Panel | 2,200 ₹1,32,000 | 5,866 ₹3,51,960 | 5,959 ₹3,57,540 | 5,990 ₹3,59,400 | 6,000 ₹3,60,000 | 1,800 ₹1,08,000 Lowest | 6,100 ₹3,66,000 |
| 7.00 | Taking out old existing worn out neoprene gasket from shutters of LT panel board single/double doors panels any type any capacity or openable on both sides and supply and fix new neoprene gasket complete all as specified and as directed.
Note for Item No 1.00 to 7.00 :-
(i) Contractor should visit the site before quoting the rate.
(ii) Rates including for any modifications/frame work and renewal/welding work during maint.
(iii) Minor spares like cleaning/lubricating and cleaning materials, nut bolts, washers, lugs/glands etc included in the unit rate and major spares will be measured and paid under relevant items of schedule
(iv) Contractor should take proper shutdown from MES rep and should take all safety precautions of equipments and manpower. Any damage of dept assets will be the responsibilites of contractor.
(v ) All T&P, safety equipments required for completion the job included in the unit rate. | 60 | Each Panel | 1,500 ₹90,000 Lowest | 3,691 ₹2,21,460 | 3,749 ₹2,24,940 | 3,768 ₹2,26,080 | 4,000 ₹2,40,000 | 1,800 ₹1,08,000 | 3,900 ₹2,34,000 |
| 8.00Supply only following spares Sl No.8.01 to 8.48 for execution under overhauling item No 1.00 to 7.00 above as per existing LT Panel/ACBs make all as per specified and as directed. | ||||||||||
| 8.01 | Supply only LED Lamp RYB (pilot LED lamp) | 5 | Set of 3 | 450 ₹2,250 | 155 ₹775 Lowest | 157 ₹785 | 158 ₹790 | 156 ₹780 | 475 ₹2,375 | 156 ₹780 |
| 8.02 | Supply only Ammeter/Voltmeter Cl-1 (Digital type and suitable to Panels Boards) | 5 | Each | 2,500 ₹12,500 | 1,328 ₹6,640 | 1,349 ₹6,745 | 1,356 ₹6,780 | 1,335 ₹6,675 | 999 ₹4,995 Lowest | 1,342 ₹6,710 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
18 Oct 2025, 6:00 pmClosed
GE CENTRAL KHADKI
GE CENTRAL KHADKI RANGE HILLS ROAD KHADKI PUNE-411003
REPAIR/MAINT/SERVICING OF LT PANELS, AIR CIRCUIT BREAKERS, LT SWITCHGEARS, APFC PANELS AND OTHER CONNECTED WORKS AT 512 ABWS AND CAFVD TECH AREA UNDER AGE E/M-II IN GE (CENTRAL) KHADKI.
2025_MES_732725_1
8275/E8 OF 2025-2026
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
512 ABWS AND CAFVD TECH area
Class D Category b(i)
7 documents required · 7 mandatory
₹500
GE CENTRAL KHADKI
₹96,000
Yes
24 Dec 2025
26 Sept 2025
20 Oct 2025
26 Sept 2025
18 Oct 2025
11 Oct 2025
26 Sept 2025 - 3 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_820406.xls
BOQ • 0.35 MB
8275Tender.pdf
Tender Documents • 8.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .