Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC PLOT NO 30 KRISHNA COTTAGE SUNDARAM NAGAR MUTHAIPURAM TUTICORIN 628 005 | TUTICORIN | TUTICORIN | TAMIL NADU | 628005 | L1 | Accepted-AOC AOC |
| Sl No | Description | Qty | Unit | Ramakrishna Enterprises L1 |
|---|---|---|---|---|
| 1.00Work contract schedule | ||||
| 1.01 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 70 | Each Pit | 390 ₹27,300 Lowest |
| 1.02 | Excavation of pole pit for 30' RCC pole / 9.00m PSC pole by using JCB or manual | 45 | Each Pit | 475 ₹21,375 Lowest |
| 1.03 | Excavation stay pit 4.5' to 5' depth by using JCB or manual | 120 | Each pit | 390 ₹46,800 Lowest |
| 1.04 | Excavation of pole pit at Hard rock requires blasting | 15 | Each pit | 1,250 ₹18,750 Lowest |
| 1.05 | Erection of PSC/RCC pole upto 8.00m. (27') crane or manual | 70 | Each Pole | 475 ₹33,250 Lowest |
| 1.06 | Erection of PSC/RCC poles/Metal Pole above 8.00M by using JCB Or Manual | 45 | Each Pole | 550 ₹24,750 Lowest |
| 1.07 | Erection of Stay set complete | 120 | Each set | 210 ₹25,200 Lowest |
| 1.08 | Fixing of " V" cross arms all type channel cross arm guarding cross arm | 80 | Each | 150 ₹12,000 Lowest |
| 1.09 | Fixing of LT 3 phase cross arms | 120 | Each | 100 ₹12,000 Lowest |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
19 Aug 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/MEDC/METTUR
O/o SE/MEDC/METTUR
Works Contract in Kolathur Sub division
2025_EB_588608_1
SE/MEDC/AEE/MM/MTR/Spec No.015/25-26
Open Tender
Electrical Works
Works
365 days
Mettur EDC
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹15,000
Yes
10 Oct 2025
4 Aug 2025
19 Aug 2025
4 Aug 2025
19 Aug 2025
4 Aug 2025
4 Aug 2025 - 19 Aug 2025
Amount
Work contract schedule
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit for 30' RCC pole / 9.00m PSC pole by using JCB or manual
Excavation stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit at Hard rock requires blasting
Erection of PSC/RCC pole upto 8.00m. (27') crane or manual
Erection of PSC/RCC poles/Metal Pole above 8.00M by using JCB Or Manual
Erection of Stay set complete
Fixing of " V" cross arms all type channel cross arm guarding cross arm
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of HT pin insulator 22 kv
Fixing of 11kv strain disc
Fixing of LT pin insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Paving of Conductor, stringing et of 7/4.09 mm ACSR
Paving Conductor,and Stringing of 7/3.35 mm AAAC
Paving Conductor, and Stringing of 7/2.59mm AAAC
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Erection of street light Service
Erection of new transformer all capacity with jumpering
loading and unloading of trans former up to 100 kva
Transport of Poles/Materials/ conductor and other Material below 8 km plains
Transport of Materials conductor and others above 8Kms for additional Km Irrespective of Weight in
Loading of materials
Unloading of materials
Loading of pole (7.5/8.0/9.14M)
Unloading of pole (7.5/8.0/9.14M)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Earthing of pole with coil earthing including burying looping and binding.
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
Alteration Back clamp
Alteration of stay clamp
Drilling of Holes Channel onl 3/4 &1" per hole
Cutting of flat
Cutting of channel
Cutting of angle
Dismantling of Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Dismantling of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Dismantling of Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Dismandling of PSC/RCC poles/Metal Pole above 8.00M by using JCB Or Manual
Dismandling of PSC/RCC pole upto 8.00m. (27') crane or manual
Dismandling of V cross arms all type channel cross arm guarding cross arm
Dismandling LT 3phase cross arms
Dismandling LT Single phase cross arms
Dismandling of HT/LT TI fitting
Dismandling of 11KV Strain disc
Dismandling of 22 KV PIN Insulator
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium Knob
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Dismandling of Stay set
Dismandling of ACSR 7/3.35MM Conductor
Dismandling of ACSR 7/2.59MM/7/2.11MM Conductor
Cutting of coconut leaves (per tree)
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .