Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 L+₹1.3 L (21.2%)Rejected-Finance CHANDAUTI | CHANDAULI | UTTAR PRADESH | ₹7.3 L+₹1.3 L (21.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.5 L+₹1.4 L (23.9%)Rejected-Finance | ₹7.5 L+₹1.4 L (23.9%) | L3 | Rejected-Finance L3 |
Tender Value
₹8.7 L
EMD Value
₹88,000
Closing Date
13 May 2026, 3:00 pmClosed
CEO GIDA
GIDA SECTOR 7 GIDA GORAKHPUR
Laying of Foundation stone and Inauguration Place of Various Projects of Gida at the site Instalation work Gida Gorakhpur
2026_UGIDA_1143744_1
497/GIDA/2026-27 DT. 24.04.2026
Open Tender
Civil Works
Percentage
90 days
GIDA GORAKHPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹88,000
9 Jul 2026
30 Apr 2026
13 May 2026
30 Apr 2026
13 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & Iead upto 30 m. Including filling, watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty).as per SI No 251 | 64.8 | Cum. | 250 | ₹16,200 |
| 2 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 13.2 | Cum. | 5,960 | ₹78,672 |
| 3 | M-150 brick work in 1:4 cement and C/sand mortar 4 in foundation and plinth including supply of all materials, labour and Tools and Plants etc. required for proper completion of work. 305 | 96 | Cum. | 4,555 | ₹4,37,280 |
| 4 | 12mm Thick plaster with cement mortar in proportion of 1:3 cement and fine sand of 1.25 FM over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) | 532 | Cum. | 157 | ₹83,524 |
| 5 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give as even shade, including supply of all materials, labour and T&P etc. required for proper completion of the | 532 | Cum. | 47 | ₹25,004 |
| 6 | Fixing granite Stone in Virtical Form on Brick work | 116 | Cum. | 1,500 | ₹1,74,000 |
| 7 | Supply of Material in T& P | 116 | Qtl | 500 | ₹58,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2136595.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .