Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JAYAM CONSTRUCTION AND SUPPLIERS L2 | G.N.Vijayasrinivasan L1 | CSK Constructions L3 |
|---|---|---|---|---|---|---|
| 1.001. Renovation of PUM School building South facing At Pallipattu H/O Pallipattu Panchayat | ||||||
| 2.00 | Supply and painting the Terrace floor with two coats of Epoxy paint as instructed by the departmental officers including preparation of surface curing , etc, complete in all floors complying with standerd specifications. | 85.2 | Sq.M | 180 ₹15,336 Lowest | 180 ₹15,336 Lowest | 190 ₹16,188 |
| 3.00 | Painting two coats over one coat of priming coat using Oil Bound Distember including all cost and conveyance etc… | 226.68 | Sqm | 150 ₹34,002 Lowest | 150 ₹34,002 Lowest | 160 ₹36,268.8 |
| 4.00 | Painting two coats over one coat of priming coat using Plastic Emulson Paint including all cost and conveyance etc… | 472.11 | Sqm | 267 ₹1,26,053.37 Lowest | 267 ₹1,26,053.37 Lowest | 267 ₹1,26,053.37 Lowest |
| 5.00 | Painting two coats over one coat of priming coat using Block Board paint including all cost and conveyance etc… | 22.6 | Sqm | 156 ₹3,525.6 Lowest | 156 ₹3,525.6 Lowest | 156 ₹3,525.6 Lowest |
| 6.00 | Painting two coats over one coat of priming coat using Enamel Paint over old iron work including all cost and conveyance etc… | 28.8 | Sqm | 159 ₹4,579.2 Lowest | 159 ₹4,579.2 Lowest | 159 ₹4,579.2 Lowest |
| 7.00 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work. | 5.46 | Sqm | 4,212 ₹22,997.52 | 1,886 ₹10,297.56 Lowest | 5,046 ₹27,551.16 |
| 8.00 | Supply and fixing of tube light | 2 | No | 672 ₹1,344 Lowest | 672 ₹1,344 Lowest | 672 ₹1,344 Lowest |
| 9.00 | Provision for Bala Painting | 1 | No | 10,000 ₹10,000 Lowest | 10,000 ₹10,000 Lowest | 10,000 ₹10,000 Lowest |
| 10.00Rain water harvesting structure | ||||||
Tender Value
Refer Docs
EMD Value
₹5,610
Closing Date
12 Aug 2026, 3:00 pmClosed
The Block Development officer (BP) Alangayam
The Block Development officer (BP) Alangayam
Tirupathur District SFC 2026-27 Renovation work of the Panchayat Union Middle School building facing south in Pallipattu village Pallipattu Panchayat Alangayam Block Package No.06
2026_RDTN_688813_1
A3/1779/2026
Open Tender
Civil Works
Item Wise
180 days
Alangayam block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,610
13 Aug 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Renovation of PUM School building South facing At Pallipattu H/O Pallipattu Panchayat | - | - | - | - |
| 2 | Supply and painting the Terrace floor with two coats of Epoxy paint as instructed by the departmental officers including preparation of surface curing , etc, complete in all floors complying with standerd specifications. | 85.2 | Sq.M | - | - |
| 3 | Painting two coats over one coat of priming coat using Oil Bound Distember including all cost and conveyance etc… | 226.68 | Sqm | - | - |
| 4 | Painting two coats over one coat of priming coat using Plastic Emulson Paint including all cost and conveyance etc… | 472.11 | Sqm | - | - |
| 5 | Painting two coats over one coat of priming coat using Block Board paint including all cost and conveyance etc… | 22.6 | Sqm | - | - |
| 6 | Painting two coats over one coat of priming coat using Enamel Paint over old iron work including all cost and conveyance etc… | 28.8 | Sqm | - | - |
| 7 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work. | 5.46 | Sqm | - | - |
| 8 | Supply and fixing of tube light | 2 | No | - | - |
| 9 | Provision for Bala Painting | 1 | No | - | - |
| 10 | Rain water harvesting structure | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_828004.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].