| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance | ₹3.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.7 LRejected-Finance | ₹3.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SHREE ENGINEERS L2 | JAGDESH PRASAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete. | 51.84 | CUM | 450 ₹23,328 | 63.7 ₹3,302.21 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 6.77 | CUM | 4,300 ₹29,111 | 5,093.16 ₹34,480.69 |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 12.7 | CUM | 4,500 ₹57,150 | 5,530.97 ₹70,243.32 |
| 4.00 | Providing and laying of RCC (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. (Excluding rate of Reinforcement Steel ) | 4.82 | CUM | 4,100 ₹19,762 | 5,871.03 ₹28,298.36 |
| 5.00 | Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 19.1 | CUM | 3,000 ₹57,300 | 5,339.24 ₹1.0 L |
| 6.00 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 14 | RMT | 298.71 ₹4,181.94 | 132.3 ₹1,852.20 |
| 7.00 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 91 | RMT | 630 ₹57,330 | 553.7 ₹50,386.70 |
| 8.00 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge | 125.03 | KG | 375 ₹46,887 | 60.92 ₹7,616.95 |
| 9.00 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 72.3 | SQM | 550 ₹39,765 | 458.64 ₹33,159.67 |
| 10.00 | Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 49.58 | SQM | 750 ₹37,185 | 671.3 ₹33,283.05 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
7 Feb 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 13 Const. of 7 Nos. Outlets at Ganhaut Minor.
2025_UPIDC_1049615_94
01-EE-2025-26
Open Tender
Civil Works - Canal
120 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹8,000
Yes
18 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
7 Feb 2026
2 Feb 2026
2 Feb 2026 - 7 Feb 2026
Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete.
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying of RCC (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. (Excluding rate of Reinforcement Steel )
Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete
Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete
Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge
Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge.
Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.68 MB
BOQ_2053780.xls
BOQ • 0.23 MB
TD13.pdf
Tender Documents • 3.48 MB
Download all tender documents and submit your bid