| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹1.5 L+₹14,682 (10.9%)Accepted-Finance | 2 | Accepted-Finance Accepted | |
| 3 | 3₹1.5 L+₹19,344.09 (14.3%)Accepted-Finance | 3 | Accepted-Finance Accepted | |
| 4 | 4₹1.7 L+₹31,074.17 (23.0%)Accepted-Finance | 4 | Accepted-Finance Accepted | |
| 5 | Rejected-Technical SINGHPUR POST VIJAYGARH DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | - | Rejected-Technical IDT 3 Not in Standard Format |
| Sl No | Description | Qty | Unit | M/S N.S. CONSTRUCTION L3 | M/s Pradeep Construction L2 | ARADHYA INFRA LTD L4 | PADAM SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00Silt clearance of Kanakpur drain from Km. 0.000 to 5.400 | |||||||
| 1.01 | Silt Clearence/trench Digging including lift up to 1.50 m & lead upto 6.0m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes By poclain/Equivalent Capacity 60/Cum./Hour i.e 2280/60 (Rs 2280 Per Hour) including Rough/Partial dressing | 6,198.88 | cum | 22.5 ₹1,39,474.8 | 22.6 ₹1,40,094.69 | 26 ₹1,61,170.88 | 19.5 ₹1,20,878.16 Lowest |
| 1.02 | Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm As Per SOR Chapter No IV/19 | 4,983 | sqm | 3 ₹14,949 | 1.94 ₹9,667.02 | 1 ₹4,983 Lowest | 2.85 ₹14,201.55 |
Tender Value
₹2.8 L
EMD Value
₹5,640
Closing Date
21 Feb 2026, 5:00 pmClosed
Executive Engineer Drainage DivisionAligarh
Office Executive Engineer Drainage DivisionAligarh
Silt Clearance of Kanakpur Cut Drain from km 0.00 to km 5.400
2026_UPIDC_1110643_2
02/EE/2025-26
Open Tender
Civil Works - Others
Item Rate
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹5,640
23 Jun 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
Silt clearance of Kanakpur drain from Km. 0.000 to 5.400
Silt Clearence/trench Digging including lift up to 1.50 m & lead upto 6.0m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes By poclain/Equivalent Capacity 60/Cum./Hour i.e 2280/60 (Rs 2280 Per Hour) including Rough/Partial dressing
Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm As Per SOR Chapter No IV/19
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.01 MB
BOQ_2074246.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .