| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.0 L+₹3.1 L (53.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | VERMA ELECTRICAL AND CONSTRUCTION CO L2 | Dinesh Traders L1 |
|---|---|---|---|---|---|
| 1.00Under the Business Plan for the year 2025-26, various materials used for the work of addition and capacity enhancement of various distribution transformers should be collected from the storage centre and safely transported to the respective work site through a kutcha or paved road, which also includes the work of loading and unloading to the respective storage centre and work site, and it also includes the work of pulling etc., and the cost of labour, T&P carrier etc. required to complete the work properly is also included. | |||||
| 2.00 | PCC Pole 8.5 Mtr Long | 22 | No | 1,180 ₹25,960 | 826 ₹18,172 Lowest |
| 3.00 | ST Pole 11 Mtr Long | 4 | No | 1,180 ₹4,720 | 826 ₹3,304 Lowest |
| 4.00 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. | 11.5 | Qtl. | 590 ₹6,785 Lowest | 708 ₹8,142 |
| 5.00 | 25 KVA 11/0.4KV Distribution Transformer | 4 | No | 2,360 ₹9,440 Lowest | 3,540 ₹14,160 |
| 6.00 | 63 KVA 11/0.4KV Distribution Transformer | 5 | No | 3,540 ₹17,700 Lowest | 3,540 ₹17,700 Lowest |
| 7.00 | 100 KVA 11/0.4KV Distribution Transformer | 2 | No | 4,720 ₹9,440 | 4,130 ₹8,260 Lowest |
| 8.00 | 250 KVA 11/0.4KV Distribution Transformer | 7 | No | 5,900 ₹41,300 Lowest | 7,670 ₹53,690 |
| 9.00 | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 8 | No | 1,416 ₹11,328 | 1,071 ₹8,568 Lowest |
| 10.00 | Grouting of 8.5 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 8 | No | 1,156.4 ₹9,251.2 | 826 ₹6,608 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
22 Sept 2025, 9:00 amClosed
SE EDC Chitrakoot
Dwarikapuri Purani Bazar Karwi Chitrakoot
Work of installation and capacity increase of additional transformers of different capacities of 11/0.4 KVA (Business Plan 2025-26) Under EDD-Karwi Chitrakoot
2025_DVVNL_1069489_2
10/SE/EDCCKT/2025-26
Open Tender
Electrical Works
Piece-work
180 days
Karwi Chitrakoot
Work of installation and capacity increase of additional transformers of different capacities of 11/0.4 KVA (Business Plan 2025-26) Under EDD-Karwi Chitrakoot
2 documents required · 2 mandatory
₹1,180
DVVNL.ORG.IN
₹6,000
3 Oct 2025
11 Sept 2025
22 Sept 2025
11 Sept 2025
22 Sept 2025
11 Sept 2025
Under the Business Plan for the year 2025-26, various materials used for the work of addition and capacity enhancement of various distribution transformers should be collected from the storage centre and safely transported to the respective work site through a kutcha or paved road, which also includes the work of loading and unloading to the respective storage centre and work site, and it also includes the work of pulling etc., and the cost of labour, T&P carrier etc. required to complete the work properly is also included.
PCC Pole 8.5 Mtr Long
ST Pole 11 Mtr Long
Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
25 KVA 11/0.4KV Distribution Transformer
63 KVA 11/0.4KV Distribution Transformer
100 KVA 11/0.4KV Distribution Transformer
250 KVA 11/0.4KV Distribution Transformer
Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of 8.5 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double-Pole for 25/63/100 KVA T/F including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double-Pole for 25/63/100 KVA T/F per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of 11 KV 3Phase D.O. Fuse Set as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection and Grouting of Stay set Complete including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work.
Construction of Plinth & Francing including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor on his own cost)
Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
Laying, Sagging and Binding ABC 1X16 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
Fixing & Commisioning of Top Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost)
Fixing & Commisioning of M.S. Base Angle with clamp (65X65X6X2028mm) For T/f as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost)
Fixing & Commisioning of Ms Dropper Channel(100X50X5X2028mm) with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost)
Fixing & Commisioning of T-off Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost)
Fixing & Commisioning of Installation of 25 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of Installation of 63 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of Installation of 100 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of Installation of 250 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Dismentling of Recived Back All Type T/F From Old site To Store including the cost of labour, T&P carrier etc required for proper completion of work.
VERMA ELECTRICAL AND CONSTRUCTION CO (BID ID -5537558)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .