| Sl No | Description | Qty | Unit | InfraEn Consulting Pvt Ltd L1 | Atormrecycling Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Labour for cutting open BT road for laying water mains or sewer including cost and conveyance of all charges etc., complete as per standard specifications.. | 2.16 | M3 | 995.08 ₹2,149.37 Lowest | 996.1 ₹2,151.58 |
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply and sewerage works in hard stiff clay,stiff black cotton,stoney earth and earth mixed withsmall size boulders and hard gravelly soil as directed by departmentel officers as per SS20B., | 35.28 | M3 | 220.25 ₹7,770.42 Lowest | 221.24 ₹7,805.35 |
| 3.00 | Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0-3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0-7mts. and (vi) 0-8mts | 12 | RM | 3,410.8 ₹40,929.6 Lowest | 3,450.1 ₹41,401.2 |
| 4.00 | Supplying and Filling in foundation and basement with Filling M-Sand in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25). | 4.32 | M3 | 2,428.65 ₹10,491.77 Lowest | 2,428.65 ₹10,491.77 Lowest |
| 5.00 | Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNBP NO.28 V,VI S25 | 2.16 | M3 | 6,394.31 ₹13,811.71 Lowest | 6,394.31 ₹13,811.71 Lowest |
| 6.00 | Benching :- P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement an20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board
Officers. | 2.2 | M3 | 7,728.27 ₹17,002.19 Lowest | 7,728.27 ₹17,002.19 Lowest |
| 7.00 | UN PLASTICIZED NON - PRESSURE POLYVINYL CHLORIDE (PVC-U) PIPES FOR | 12 | RM | 475 ₹5,700 Lowest | 500 ₹6,000 |
| 8.00 | Lowering in trenches, laying, aligning in proper
grade etc., complete and as directed by departmental officers. | 24 | RM | 43.57 ₹1,045.68 Lowest | 44.56 ₹1,069.44 |
| 9.00 | Refilling the outside of the well with excavated earth (other then sand) complying with standard specification for filling the foundation including watering consolidation etc., complete as directedby the TWAD Board Officers. | 34.9 | M3 | 33.5 ₹1,169.15 Lowest | 33.5 ₹1,169.15 Lowest |
| 10.00 | Disposal of surplus excavated earth in pipe laying and road restoration works etc.,transporting to the sites specified by Engineer within 5 Km lead, including loading, spreading etc., complete and as directed by the Engineer. | 0.59 | M3 | 103.2 ₹61.09 Lowest | 103.2 ₹61.09 Lowest |
Tender Value
₹1.3 L
EMD Value
₹1,300
Closing Date
19 Jan 2026, 3:00 pmClosed
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
Rehabilition of 200mmSewer line in ward 14 Kalasanthi Kattalai Street in Kumbakonam City Municipal Corporation
2026_MAWS_643561_1
308/2026/E2
Open Tender
Civil Works
Item Rate
kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,300
Yes
8 Oct 2026
14 Jan 2026
19 Jan 2026
14 Jan 2026
19 Jan 2026
14 Jan 2026
Amount
Labour for cutting open BT road for laying water mains or sewer including cost and conveyance of all charges etc., complete as per standard specifications..
Earth work excavation and depositing on bank with initial lead of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply and sewerage works in hard stiff clay,stiff black cotton,stoney earth and earth mixed withsmall size boulders and hard gravelly soil as directed by departmentel officers as per SS20B.,
Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0-3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0-7mts. and (vi) 0-8mts
Supplying and Filling in foundation and basement with Filling M-Sand in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25).
Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNBP NO.28 V,VI S25
Benching :- P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement an20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
UN PLASTICIZED NON - PRESSURE POLYVINYL CHLORIDE (PVC-U) PIPES FOR
Lowering in trenches, laying, aligning in proper grade etc., complete and as directed by departmental officers.
Refilling the outside of the well with excavated earth (other then sand) complying with standard specification for filling the foundation including watering consolidation etc., complete as directedby the TWAD Board Officers.
Disposal of surplus excavated earth in pipe laying and road restoration works etc.,transporting to the sites specified by Engineer within 5 Km lead, including loading, spreading etc., complete and as directed by the Engineer.
Dewatering using 3HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. 5 HP
Atormrecycling Private Limited (BID ID -1565979)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_771109.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
BOQ_771109.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .