Loading…
Loading…
Tender Value
₹20.4 L
EMD Value
₹1.7 L
Closing Date
31 Aug 2026, 3:00 pm3d left
Chief Engineer
Nagar Nigam Firozabad
Construction of RCC drains and CC roads in Ward No. 44, Suhag Nagar spanning the areas from Ajay to Rakesh Bhadauria, Sumit Jain to Manoj Darapur, Manoj to Jain Sahib, and Shankul Singh to Pankaj.
2026_DOLBU_1178365_24
10/Nirman/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,036
Municipal Corporation
₹1.7 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete pavement by mechanical means using pneumatic tools, breakingg to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately. (PWD SOR 2025-26, Chepter-10, Item No.6 ) | 75.77 | Cum | 690 | ₹52,281.3 |
| 2 | Dismentling Of old Brick/ Tiles Work/ Rubble Manossary/ Pitching E.t.c by Manual Means .(PWD SOR 2025-26, Chepter-10 SI No. 3, Spec. No. 204. | 9.08 | Cum | 404 | ₹3,668.32 |
| 3 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2017-18, Chepter-3, Item No. 231a ) | 76.37 | Cum | 230.1 | ₹17,572.74 |
| 4 | Class-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) | 0.99 | Cum | 5,500 | ₹5,445 |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 15.23 | Cum | 8,100 | ₹1,23,363 |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 15.98 | Cum | 8,300 | ₹1,32,634 |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) | 115.11 | Cum | 3,234 | ₹3,72,265.74 |
| 8 | CEMENT CONCRETE PAVEMENT(C.C ROAD) constructionof un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed ..... ……………. Complete. CHAPTER- 20 (New Item). | 101.75 | Cum | 7,700 | ₹7,83,475 |
| 9 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | 2.03 | Cum | 7,650 | ₹15,529.5 |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 26.09 | Qtl | 7,800 | ₹2,03,502 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2214723.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].