Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance HOUSE NO 417 WARD NO 01 NEAR BHARATDWAJ PALACE KOTAR KALA DISTT SIDHI M P | SIDHI | MADHYA PRADESH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 00 00 NAPASAR ROAD NENO KA BASS BIKANER RAJASTHAN BIKANER RAJASTHAN 334022 UDYAM RJ 08 0001676 | BIKANER | RAJASTHAN | 334022 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.4 L
Closing Date
19 Feb 2021, 3:00 pmClosed
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Removal of obstruction and cleaning of Bajitpur drain from RD 0 m to 8049 M and maintenance for a period of 4 Months.
2021_IFC_200054_1
EE/CD-VIII/NIT/2020-21/29
Open Tender
Civil Works
Item Rate
210 days
DELHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
25 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, within land boundary disposed earth to be levelled and neatly dressed including quantities of works in executed in or under foul position, including pumping out water as required for all kinds of soil.
Removal of all obstructions from the bed of the drain including Hyacinth jungle patera, wild growth including garbage and desilting wherever required from the bed and bank of the drain by deploying JCB machine & disposal of same with in land boundary, as per direction of Engineer in charge wherever required. For Initial cleaning of entire reach
For july
For August
For September
For October
Removal of all obstructions from the bed of the drain including jungle patera, hyacinth, wild growth including garbage and desilting whereever required from the bed and side slope/bank of the drain by deploying pocklain machine & disposal of same with in land boundary as per direction of Engineer incharge, as and when required. For Initial cleaning of entire reach
For july
For August
For September
For October
Disposal of excavated earth /malba along outer land boundary of mungeshpur Drain loading undloading within a lead of 10 Km.
Disposal of Floating material or waste material by mechanical transport including loading, unloading, transporting to approved Remky plant, Bawana for lead upto 18 km for all lifts, complete as per directions of Engineer-in-charge.
Nish Earth Movers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .