| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹2.2 LRejected-AOC | ₹2.2 L | L2 | Rejected-AOC Qualified in AOC |
| 3 | L3₹2.4 LRejected-AOC | ₹2.4 L | L3 | Rejected-AOC Qualified in AOC |
| 4 | L4₹2.4 LRejected-AOC | ₹2.4 L | L4 | Rejected-AOC Qualified in AOC |
| 5 | L5₹2.6 LRejected-AOC | ₹2.6 L | L5 | Rejected-AOC Qualified in AOC |
| Sl No | Description | Qty | Unit | KALAIMANI VIJAYAGOPAL L5 | GP Enterprises L3 | sriramulu L4 | T.SEEMAN L1 | P.NEELARAMAN L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B | 3.2 | CUM | 240 ₹768 | 260 ₹832 | 237 ₹758.40 | 199.9 ₹639.68 | 223.55 ₹715.36 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 0.8 | CUM | 5,300 ₹4,240 | 6,635 ₹5,308 | 4,810 ₹3,848 | 4,061.45 ₹3,249.16 | 4,542.4 ₹3,633.92 |
| 3.00 | Suppy and ercting Centering chargesl including cost and convenyance all materials to site etc complete. | 18 | CUM | 1,090 ₹19,620 | 2,800 ₹50,400 | 400 ₹7,200 | 415.7 ₹7,482.60 | 464.95 ₹8,369.10 |
| 4.00 | RCC 1:1.5:3 including cost and conveyance of all materials to site mixing, palcing, curing and all labour charges etc. complete | 7.2 | CUM | 9,100 ₹65,520 | 2,500 ₹18,000 | 8,900 ₹64,080 | 6,890.15 ₹49,609.08 | 7,706.1 ₹55,483.92 |
| 5.00 | Supply Supply fabrication of steel | 0.66 | CUM | 91,500 ₹60,390 | 7,000 ₹4,620 | 83,362 ₹55,018.92 | 69,812.1 ₹46,075.99 | 78,079.3 ₹51,532.34 |
| 6.00 | Ceiling Plastering 1:3 complete as per standard specificatins and as directed by the departmental officers. | 4.42 | SQM | 280 ₹1,237.60 | 5,500 ₹24,310 | 295 ₹1,303.90 | 246.25 ₹1,088.42 | 275.4 ₹1,217.27 |
| 7.00 | Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departmental officer) and as directed by the TWAD Board officers. | 166.61 | MT | 166 ₹27,657.26 | 262 ₹43,651.82 | 236 ₹39,319.96 | 199.5 ₹33,238.69 | 223.15 ₹37,179.02 |
| 8.00 | 65mm GI pipes for inlet connection | 8 | MT | 605 ₹4,840 | 700 ₹5,600 | 515 ₹4,120 | 424.85 ₹3,398.80 | 475.15 ₹3,801.20 |
| 9.00 | 65mm GI pipes for over flow & rain water harvesting pipe | 8 | MT | 605 ₹4,840 | 75 ₹600 | 515 ₹4,120 | 424.85 ₹3,398.80 | 475.15 ₹3,801.20 |
| 10.00 | 50mm GI pipes for scour pipe | 5 | MT | 470 ₹2,350 | 700 ₹3,500 | 403 ₹2,015 | 332.1 ₹1,660.50 | 371.45 ₹1,857.25 |
Tender Value
₹2.8 L
EMD Value
₹3,000
Closing Date
3 Mar 2026, 3:00 pmClosed
The Block Development Officer BP
Panchayat union office Building Lathur at Pavunju
Renovation of 60000 Ltr OHT in Kalpattu at Thiruvadhur Panchayat in Lathur Panchayat Union. RRMS/2025-2026 Estimate.2.81 Lakhs
2026_RDTN_666886_1
Tender ref no . 0330/2026/A4 Date.14.02.2026
Open Tender
Civil Works
Renovation of 60000 Ltr OHT in Kalpattu at Thiruva
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
Yes
23 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete.
Suppy and ercting Centering chargesl including cost and convenyance all materials to site etc complete.
RCC 1:1.5:3 including cost and conveyance of all materials to site mixing, palcing, curing and all labour charges etc. complete
Supply Supply fabrication of steel
Ceiling Plastering 1:3 complete as per standard specificatins and as directed by the departmental officers.
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departmental officer) and as directed by the TWAD Board officers.
65mm GI pipes for inlet connection
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm dia GI bend (short)
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75mmx63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Technical.pdf
Tender Documents • 0.95 MB
BOQ_801130.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid