| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.10Accepted-Finance | ₹5.10 | L1 | Accepted-Finance As per the Financial Committee Report |
| 2 | L2Accepted-Finance | - | L2 | Accepted-Finance As per the Financial Committee Report |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
17 Aug 2023, 6:00 pmClosed
Chief Executive Officer, Deolali Cantonment Board
Office Of the Cantonment Board , Cannaught Road , Deoloali Camp- 422401
Maintenance of Cantt. Fund roads with SDBC Deolali
2023_DGDE_764416_1
R and B Sr No.75/2023-24. SDBC
Open Tender
Civil Works
Works
243 days
Deolali Cantonment Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,500
Chief Executive Officer, Cantonment Board Deolali
₹90,000
25 Aug 2023
1 Aug 2023
18 Aug 2023
1 Aug 2023
17 Aug 2023
1 Aug 2023
Amount
Maintenance of Cantt. Fund Roads with SDBC
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) a) 75 Millimetre
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) b) 50 Millimetre
Anand Construwell Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .