Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.4 LAdmitted-Finance | ₹46.4 L | L1 | Admitted-Finance |
| 2 | L2₹50.2 LAdmitted-Finance | ₹50.2 L | L2 | Admitted-Finance |
| 3 | L3₹52.3 LAdmitted-Finance | ₹52.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.RAMAN L2 | PANDIYAN BROTHERS L1 | RAMBAL HITECH ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Site supply, fabrication and testing of MS duct made up from MS CR sheet metal as per specifications and drawings | 11,000 | kg | 160 ₹17.6 L | 127 ₹14.0 L | 150 ₹16.5 L |
| 2.00 | Site erection and integration of ducting with existing system as per specifications and drawings | 11,000 | kg | 60 ₹6.6 L | 38 ₹4.2 L | 40 ₹4.4 L |
| 3.00 | Site supply, fabrication, erection and testing of support Structurals for ducts as per specifications and drawings | 5,000 | kg | 140 ₹7 L | 130 ₹6.5 L | 130 ₹6.5 L |
| 4.00 | Site providing cement plastering type insulation over the surface of the ducting system as per the specifications and drawing. | 400 | sq.m. | 1,500 ₹6 L | 2,500 ₹10 L | 900 ₹3.6 L |
| 5.00 | Cutting and making cut pieces of old ducts and disposal to DPS Stores, IGCAR as per technical specifications | 10,500 | kg | 50 ₹5.3 L | 5 ₹52,500 | 30 ₹3.1 L |
| 6.00 | Removing of old insulation (cement plastering, 15mm thick) from the old ducts and dispose to identified places as per technical specifications | 154 | sq.m. | 200 ₹30,800 | 75 ₹11,550 | 200 ₹30,800 |
| 7.00 | Providing site supply, fabrication and erection of canopy type covering (PVC roof with MS structurals support) to the entire travels/length of ducts as per specifications and drawings | 445 | sq.m. | 1,000 ₹4.5 L | 2,300 ₹10.2 L | 3,000 ₹13.3 L |
| 8.00 | Commissioning of the ducting system as per specifications | 15 | Times | 20,000 ₹3 L | 6,000 ₹90,000 | 30,000 ₹4.5 L |
Updated dates
Tender Value
₹56.4 L
EMD Value
₹1.1 L
Closing Date
27 Nov 2025, 3:00 pmClosed
Superintending Engineer, MMG, IGCAR
Room No. G5, NDED Building, IGCAR, Kalpakkam - 60102
Supply of ducting material, site fabrication, installation and commissioning of supply ducts of system -III, phase-I and phase-II of RML hot cells ventilation system as per the specifications and drawings.
2025_IGCAR_884222_1
IGC/MMG/PIED/HVOS/SD/01/2025
Open Tender
Metal Fabrication
183 days
RML Building
--
2 documents required · 2 mandatory
₹0
₹1.1 L
30 Jan 2026
5 Nov 2025
28 Nov 2025
5 Nov 2025
27 Nov 2025
7 Nov 2025
5 Nov 2025 - 7 Nov 2025
Site supply, fabrication and testing of MS duct made up from MS CR sheet metal as per specifications and drawings
Site erection and integration of ducting with existing system as per specifications and drawings
Site supply, fabrication, erection and testing of support Structurals for ducts as per specifications and drawings
Site providing cement plastering type insulation over the surface of the ducting system as per the specifications and drawing.
Cutting and making cut pieces of old ducts and disposal to DPS Stores, IGCAR as per technical specifications
Removing of old insulation (cement plastering, 15mm thick) from the old ducts and dispose to identified places as per technical specifications
Providing site supply, fabrication and erection of canopy type covering (PVC roof with MS structurals support) to the entire travels/length of ducts as per specifications and drawings
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
phaseonesupp.pdf
Additional Documents • 0.19 MB
TenderDocument.pdf
Tender Documents • 0.48 MB
Phasetwosu.pdf
Additional Documents • 0.17 MB
phaetwosupp.pdf
Additional Documents • 0.55 MB
BOQ_929376.xls
BOQ • 0.28 MB
GCC.pdf
Additional Documents • 6.97 MB
Download all tender documents and submit your bid