Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
8 Jun 2026, 4:00 pm3d left
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_311280_2
Short e-NIT No. DRSP/23 of 2026-27 Dated 01-06-2026
Open Tender
Civil Works
60 days
Nandpur
eNIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹9,900
R S Pura
1 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr.(All Kinds) | 50.88 | cum | 256.85 | ₹13,068.53 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size). | 12.72 | cum | 4,826.5 | ₹61,393.08 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | 31.8 | cum | 5,733.6 | ₹1,82,328.48 |
| 4 | Providingand and laying in position specified grade of reinforced cement concrete (1:1.5:3) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. | 1.89 | cum | 7,788.4 | ₹14,720.08 |
| 5 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete | 151.2 | kg | 123.2 | ₹18,627.84 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 35.62 | cum | 218.4 | ₹7,779.41 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 47.7 | sqm | 416.5 | ₹19,867.05 |
| 8Centring and shuttering including strutting, propping etc and removal of form work for.- | |||||
| 8.1 | Foundations footings. bases of columns | 212 | sqm | 286.35 | ₹60,706.2 |
| 8.2 | Suspended floor/slab | 5.4 | sqm | 718.2 | ₹3,878.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1008026.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid