Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹23.0 L+₹60,911.17 (2.72%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹25.9 L+₹3.4 L (15.4%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
9 Feb 2026, 4:00 pmClosed
Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwari
construction of Two Additional Classrooms (Double Story) at Govt. High School Patta Bohri. (Zone Jammu) Distt. Jammu
2026_PWDJK_301497_5
Short e-NIT No. 105 of 2025-26 Dated 27-01-2026
Open Tender
Civil Works
Percentage
180 days
Satwari
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹72,000
Satwari
18 Feb 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing RCC work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable materialwithin 50 meters lead as per direction of Engineer in charge | 6.75 | Cum | 2,516.85 | ₹16,988.74 |
| 2 | Demolishing of Brickwork manually/Mechanical means including stacking of servicable material and disposed of unservisable material within 50 meters lead as per direction of Engineer incharge | 14.66 | Cum | 1,458.85 | ₹21,386.74 |
| 3 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc(not exceeding 1.5 mt width) for shafts, wells, cesspits and the like not exceeding 10sqm on plan depth upto 1.5 mt including disposal of excavated earth upto 1 mt from cutting edge disposed earth to be levelled and neatly dressed in. All kind of soil. | 44.86 | Cum | 479.3 | ₹21,501.4 |
| 4 | P/L in position cement concrete of specified grade including curing but excluding the cost of centerring and shuttering. All works upto plinth level with (1:4:8) mix 40mm aggregate | 13.92 | Cum | 5,202.9 | ₹72,424.37 |
| 5 | P/L in position cement concrete of specified grade including curing but excluding the cost of centerring and shuttering. All works upto plinth level with (1:3:6) mix 20 mm stone aggregate. | 35.6 | Cum | 5,733.6 | ₹2,04,116.16 |
| 6 | P/L in position specified grade of rienforced cement concrete excluding the cost of centering and shuttering, finishing and rienforcement. All works upto plinth level with (1:1.5:3) mix 20mm size aggregate | 12.56 | Cum | 7,788.4 | ₹97,822.3 |
| 7 | Centerring and shuterring including placing, strutting etc. And removal of form | 164.85 | Sqm | 286.35 | ₹47,204.8 |
| 8 | Centering and shuttering including placing, strutting, etc. And removal of form for suspended floors, roofs,landings etc | 181.46 | Sqm | 718.2 | ₹1,30,324.57 |
| 9 | Centerring and shuterring including placing, proping and removal of form for lintels, beams etc. | 66.73 | Sqm | 577.55 | ₹38,539.91 |
| 10 | Centering and shuttering for Coloumns, Pillars, Piers, Abutments etc. | 122.21 | Sqm | 742.55 | ₹90,747.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_978362.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .