| 1 | 1₹78,186Accepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹89,000+₹5,540 (6.64%)Rejected-AOC 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹1,100
Closing Date
14 Jul 2021, 2:00 pmClosed
SE M II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II AHP Unit I Annual overhauling works of valves and replacement of corroded pipes of sea water Booster Pumps during 2021 22
2021_EB_204112_1
SE / M-II / TTPS / Spec.No.218/2021-22
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,100
Yes
2 Jan 2023
29 Jun 2021
15 Jul 2021
29 Jun 2021
14 Jul 2021
29 Jun 2021
Charges for Dismantling of 1 No 600 NB punctured 4 mtr length pipe from SWBP discharge header line of unit –I
Charges for Erection of 1 No fabricated 4 mtr length at a height of 3-5 mtr pulling the adjacent pipe line for making adequate gap and connecting with existing pipe line providing necessary supports to the pipes arresting the pipes by hooks tightening the bolts etc.
Charges for dismantling & erection of 600 X 600 NB “T” piece in Heat Exchanger Booster Pump suction tunnel tapping header line as per site condition including transportation of materials, scaffolding and devolution to stores and cost of consumables.
Charges for fabrication of 1 No 600 NB M.S pipe by cutting to the required length as per site condition - Positioning, pre matching with existing line and welding 2 Nos flanges at both end with M.S pipes.
Charges for cutting and removing the 600 NB flange from punctured pipe and machining the welding burs and making suitable for re-welding with new pipe including charges for T&P and consumables, etc.,
Charges for overhauling of 600 NB Butterfly valve: Dismantling from the suction and discharge line of the Heat Exchanger Booster Pumps dismantling the connected parts, complete cleaning and Inspection of the parts, replace the worn out parts if necessary reassembling, checking open / close operation, refixing the equipment again in position, including cost of consumables hire charges for T&P etc.
Charges for overhauling of 450 NB Butterfly valve: Dismantling from the suction and discharge line of the Heat Exchanger Booster Pumps, dismantling the connected parts, complete cleaning and Inspection of the parts, replace the worn out parts if necessary reassembling, checking open / close operation, refixing the equipment again in position, including cost of consumables hire charges for T&P etc.
Cleaning and painting the equipments, pipe lines, valves and steel structures with two coat of enamel paint including cost of paint, consumables, painting brush and cotton waste
GAYATHRI ENGINEERING ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .