Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹18,500
Closing Date
3 Mar 2025, 3:00 pmClosed
Dy General Manager C and P
APL Namrup
INSTALLATION OF ONE NEW DEEP TUBE WELL INSIDE THE 100 TPD METHANOL PLANT PREMISES
2025_ICD_42555_1
APL/CnP/CIVIL/2024-25/395
Open Limited
Civil Works
Item Rate
55 days
APL NAMRUP
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
₹18,500
Yes
17 Jun 2025
6 Feb 2025
4 Mar 2025
6 Feb 2025
3 Mar 2025
6 Feb 2025
Amount
Charges for mobilization & demobilization of required equipments & materials including subsequent movement from one well location to another.
Cost of making 600mm dia bore hole by R.C Rig for the 300 x 150 mm size well and reaming in normal alluvial formation.
Same as Item No. 1.4 but in thick boulder & pebble bed.
Supply,fitting &fixing, lowering and installation of Fabricated heavy duty G.I. Pipe(column pipe) 10 Nos confirming to IS 1239 (Part-I) 2004, with G.I. Flange at both end (G.I. Flange having 8 nos. hole as per B.S.S.-10 Part-I, table-D, of size:- A) 01 No of GI Pipe implies=150mm dia × 3.00 Mtr. long
Cost of Lowering the assembly pipes concentrically in the borehole including cutting, joining, fitting & fixing of pipes as directed.
Supply & installation of 6.35 mm thick 300 NB MS ERW (IS:3589 SAIL / TATA / JINDAL) housing pipe. (necessary test certificate to be produced.)
Supply & installation of 6.35 mm thick 150 NB MS ERW )IS: 3589 SAIL / TATA / JINDAL) blind pipe. (necessary test certificate to be produced.)
Supply & installation of 6.35 mm thick 150 NB MS ERW slotted strainer pipe. (necessary test certificate to be produced.)
Supplying & fitting MS reducer of size 300 x 150 mm dia.
Supplying & fitting 300 mm dia housing clamp.
Supplying & fitting 300 mm dia well cap.
Supplying & fitting 150 mm dia bail plug.
Supplying & installation of MS bend 90°,150mm dia.
Supplying & packing 3 to 8 mm size pea gravel free from dirt, dust & other foreign material in the annular space between bore hole and assembly pipe.
Development of tube well by air compressor or by over pumping unit for 72 hours or till sand free discharge is obtained including carrying out necessary yield test and fixing draw down level.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .