| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 L+₹125.98 (0.04%)Rejected-Finance | ₹3.1 L+₹125.98 (0.04%) | L2 | Rejected-Finance Second Less |
| Sl No | Description | Qty | Unit | ANBUMANI L1 | SRI SHUBHAM CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Providing Culvert at TV Room Street H/o Mulvoy Panchayat Span (1.5m) | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 46.8 | cum | 260 ₹12,168 Lowest | 262 ₹12,262 |
| 3.00 | Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete | 3.51 | cum | 5,924 ₹20,793 Lowest | 5,924.47 ₹20,795 |
| 4.00 | Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete | 64.69 | Sqm | 547.5 ₹35,418 Lowest | 547.5 ₹35,418 Lowest |
| 5.00 | Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete | 9.12 | Sqm | 1,095 ₹9,990 Lowest | 1,095 ₹9,990 Lowest |
| 6.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 21.52 | cum | 6,198 ₹1,33,381 Lowest | 6,198.44 ₹1,33,390 |
| 7.00 | Supply and fabrication of steel for Rcc items including cost and conveyance of binding wire, etc., Complete | 0.31 | mt | 91,932 ₹28,499 Lowest | 91,932.1 ₹28,499 Lowest |
| 8.00 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc, | 1.99 | cum | 9,665.5 ₹19,234 Lowest | 9,665.95 ₹19,235 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 46,706.94 ₹46,706.94 Lowest | 46,726.02 ₹46,726.02 |
Tender Value
₹3.1 L
EMD Value
₹3,120
Closing Date
5 Feb 2026, 3:00 pmClosed
BDO VP AKM
Panchayat Union Arakkonam
Providing Culvert at TV Room Street H/o Mulvoy Panchayat Span (1.5m)
2026_RDTN_651004_1
AA2/0291/2026
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,120
Yes
18 Aug 2026
4 Feb 2026
5 Feb 2026
4 Feb 2026
5 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Culvert at TV Room Street H/o Mulvoy Panchayat Span (1.5m) | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 46.8 | cum | 263.78 | ₹12,344.9 |
| 3 | Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete | 3.51 | cum | 5,924.47 | ₹20,794.88 |
| 4 | Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete | 64.69 | Sqm | 547.5 | ₹35,417.78 |
| 5 | Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete | 9.12 | Sqm | 1,095 | ₹9,989.69 |
| 6 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 21.52 | cum | 6,198.44 | ₹1,33,390.46 |
| 7 | Supply and fabrication of steel for Rcc items including cost and conveyance of binding wire, etc., Complete | 0.31 | mt | 91,932.1 | ₹28,498.95 |
| 8 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc, | 1.99 | cum | 9,665.95 | ₹19,235.24 |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_780609.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .