Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹28.2 L+₹3.7 L (15.3%)Rejected-Finance WZ 831 NANGAL RAYA PANKHA ROAD NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L2 | Rejected-Finance Other than lowest |
Tender Value
₹36.6 L
EMD Value
₹73,300
Closing Date
30 Nov 2022, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINTENANCE OF ELECTRICAL PASSENGER LIFTS (TOTAL 28 NOS) LIFTS INSTALLED AT S P MARG (BLOCK NO 1 TO 25) ABHM (BLOCK SARAGARHI, AKURA) UNDER GE(U) PM DELHI CANTT-10
2022_MES_560960_1
GE(U)/PM/D-49/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
DELHI CANTT-10
MES contractor enlisted under class D category c(ii) having deposited standing security of Rs 100000 with department. Contractor not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
6 documents required · 6 mandatory
₹500
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
₹73,300
Yes
20 Dec 2022
2 Nov 2022
2 Dec 2022
2 Nov 2022
30 Nov 2022
16 Nov 2022
Amount
Comprehensive maintenance of electrically operated passenger lifts installed at S P Marg, lift in reliable safe and efficient operating condition through MoU with OEM by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floors i.e total Six landings with electric power operated doors, auto electric levelling device installed complete all as specified and as directed. S P MARG:- (Block/ Building):- P/01 to P/25 (Total 25 Nos. Lift) Make of Lift:- OTIS Elevator Lifts, Capacity 08 Passengers = 25 Nos. lift ABHM SARAGADI:- (Total 02 Nos. Lift) Make of Lift:- OTIS Elevator Lifts, Capacity 08 Passengers = 02 Nos. lift AKURA:- (Total 01 No. Lift) Make of Lift:- OTIS Elevator Lifts, Capacity 08 Passengers = 01 No. lift Total Qty = 28 Nos x 11 month = 308.00
Notes for Item No. 1.00 :- (i) The comprehensive maintenance (Gold Agreement) shall be done through OEM of existing lifts i.e. of M/s OTIS Elevator Co. India Ltd. (ii) The contractor will have to submit MOU on stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 94 to 96 from OEM of existing lifts i.e of M/s OTIS Elevator Co. India Ltd. within Twenty Eight days from date of Acceptance of tender. If the delay from OEM side to submit the MoU, the contractor to be submit evidence to the Accepting Officer and permission to be obtained from Accepting Officer for delay in submission of MoU. (iii) Contractor will conclude AMC with OEM and copy of the Agreement along with Tax Invoice will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as and when required for smooth and efficient functioning of the equipment/lift. (v) The contract included for repair, replacement of machines, motors, generators, door ropes, inverter/ ARD system, controller parts, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock break shoes, liners, contactors, relays, push bottons, coils, door operator VVF drive, VVVF main drive, car door, safety device limit switches, governor, hoistway door locks, indicators and minor mechanical spare parts. The cost of above materials are deemed to be included in the rates quoted by the contractor. (vi) The materials like replacement of car cabin, ceiling frames, panels, fixtures, hoist way door panels, door frames, sills, car floorings, floor covering, light fittings, bulbs, tubes, main line power swtiches, breakers, feeders to controller, hoist way wiring, hydralic jack outer casing, burried piping, alignment of elevator guide rails, smoke and fire sensors, communication devices, security systems, landing doors, sheave rim, hoist rope, ARD battery and cabin fans are not included in the quoted rate.
Notes for Item No. 1.00 contd.../ :- (vii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (viii) Contractor will prominently display his contact/ mobile number and OEM contact number inside and outside the lift on each lift for call in emergency. (ix) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge. (x) Contractor to be submit Safety Security Certificate of lifts from OEM in every month as per performa mentioned in Particular Specification here-in-after and also contractor to submit serviceability of lights and fans in lifts and machine room in every month in writing. (xi) The OEM will also detail one technician staff to inspect the lift every week regarding functioning of lifts or any other issues arising in the lift. The problem noticed if any to be informed immediately to JE E/M / Engr-in-Charge. Incase no technician detailed Rs. 500/- per week per lift will be deducted from conctractors dues. Technician should alaways carry service tools during site visit in every week. (xii) Contractor please note that monthly service will not be paid for the building undergoing Special Repair/ Unoccupied Buildings and no penalty shall be imposed upon contractor or as per direction of Engr-in-Charge. (xiii) Monthly maintenance check will be carried out by OEM as per monthly maintenance check list mentioned in Particular Specification here-in-after.
Tushar engineers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .