Loading…
Loading…
Tender Value
₹98.5 L
EMD Value
₹6.9 L
Closing Date
23 Jun 2026, 3:00 pm
Chief Engineer
Motijheel Nagar Nigam Kanpur.
Construction of nala work from parampurwa bramha steel chauraha to jalpa devi mandir via sai tent house Under Ward-16 Zone-5
2026_NNKAN_1159910_1
173/AA-5/26-27
Open Tender
Civil Works
120 days
Ward-16
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,522
₹6.9 L
13 Jun 2026
13 Jun 2026
23 Jun 2026
13 Jun 2026
23 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in trenches for foundation pipes cabel etc in ordinary soil (Loan clay or sand) including lift upto 1.5m. Lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the engineer i/c within a lead of 50m.SCH P.W.D -251 | 1 | Cum. | 215 | ₹214.98 |
| 2 | Providing and laying in cement concrete 1:6:12 (1cement : 6 fine sand : 12 graded brick aggregate 40mm nominal size) and curing complete, including cost of formwork in foundation and floors.SI.No.273 | - | Cum. | 4,380 | - |
| 3 | providing and laying in position specified grade of reinforced cement ,concrete, excluding the cost of centering, shuttering, finishing and reinforcement all plinth level 1:1.5:3 (1cement :2 coarse sand :4 graded stone 20mm aggregate) work. REF NO 5.1.2 | 1 | Cum. | 7,590 | ₹7,589.24 |
| 4 | providing and laying cement concrete in rettaining walls, return walls wlls (anythickness) including attached pilasters,coumns,piers abutments, pillars,posts, struts buttresses string or lacing courses,parapets, coping bed block, anchore block, plain window sills, fillets,sunken floor etc ip to floor five level excluding the cost of centreung shutting and finishing. ( 1:1.5:3 (1cement :2 coarse sand :3 graded stone 20mm aggregate) chapter 5 sl.no. 2 (4.2.2) | 1 | Cum. | 8,400 | ₹8,399.16 |
| 5 | mild steel of iron work in plane workforcedment concret or reinforsment brick work (when not included inoverall rates) WROUGTH to required shape as necessery including binding for proper complaction of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level/(Over all Rate) 12mm to 32mm tor | 0.16 | Qtl. | 7,200 | ₹1,151.28 |
| 6 | Supply and fixing of Shuttering etc all comp. | - | Sqm. | 390 | - |
| 7 | Disposal of surplus earth upto 3km including loading & unloading etc all.complete. | 0.04 | Cum. | 116.96 | ₹4.67 |
| 8 | Add GST | - | Gst | 15,02,542.47 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.39 MB
BOQ_2173847.xls
BOQ • 0.28 MB
T2.pdf
Tender Documents • 5.27 MB
Download all tender documents and submit your bid