| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.1 LAccepted-AOC MADURAI | MADURAI | TAMIL NADU | 625001 | ₹93.1 L Quoted ₹97.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | HEADWAY CONSTRUCTION L1 | SRI BALAJII CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.01 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loosesoilwithout damage the Water Supply andother Pipe lines. TheRate inclusiveof all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 1,400 | M3 | 97 ₹1.4 L | 106.2 ₹1.5 L |
| 2.01 | Providing Granular surface base to the required surface using murram,Granular soil of size varying from 4mmto75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer(Each layer not exceeding100mm) including hire charges of Roller etc,complete as per the direction of Departmental officers. | 500 | M3 | 2,175.7 ₹10.9 L | 2,382.4 ₹11.9 L |
| 3.01 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-23 -SL No:8 | 500 | M3 | 2,774.6 ₹13.9 L | 3,038.2 ₹15.2 L |
| 4.01 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 5,000 | M2 | 91.6 ₹4.6 L | 100.3 ₹5.0 L |
| 5.01 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 5,000 | M2 | 20.7 ₹1.0 L | 22.7 ₹1.1 L |
| 6.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 250 | M3 | 11,410.9 ₹28.5 L | 12,494.9 ₹31.2 L |
| 7.01 | Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 150 | M3 | 12,001.2 ₹18.0 L | 13,141.3 ₹19.7 L |
| 8.01 | Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glass beads @ 250gms.per sqm.area.thickness of 2.5mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level uniform and free from streadks sdand holes etc complete.(as per MORT & H Specification no803) | 250 | M2 | 933.3 ₹2.3 L | 1,022 ₹2.6 L |
| 9.01 | Raising the existing circular man hole in heavy type including the removing the existing man hole cover with frame and dismantling the existing the cement concrete wall and tar road surface around the manholes using for raising the manhole with 1:2:4 (25 mm height 30cm height) including centering inside the manhole laying 15cm thick cement concrete 1:2:4(one cement two sand four aggregates) with 20mm granite chips for finishing the top surface of manhole etc., complete | 40 | Nos | 5,375.2 ₹2.2 L | 5,885.8 ₹2.4 L |
| 40.01 | Sub Total | 1 | LS | 0 ₹82.7 L | 0 ₹90.6 L |
Updated dates
Tender Value
₹93.1 L
EMD Value
₹93,104
Closing Date
28 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai,Thallakulam, Madurai.
Formation of BT Surface Sector 6 main road (115019S00027) in Ward No 19
2026_MAWS_643194_1
E1/000361/TURIP/Pack-72/25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹93,104
Aringar Anna Maligai
2 Mar 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Preparing the Existing surface to laying the road to Proper Gradient and remove the loosesoilwithout damage the Water Supply andother Pipe lines. TheRate inclusiveof all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Providing Granular surface base to the required surface using murram,Granular soil of size varying from 4mmto75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer(Each layer not exceeding100mm) including hire charges of Roller etc,complete as per the direction of Departmental officers.
Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-23 -SL No:8
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glass beads @ 250gms.per sqm.area.thickness of 2.5mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level uniform and free from streadks sdand holes etc complete.(as per MORT & H Specification no803)
Raising the existing circular man hole in heavy type including the removing the existing man hole cover with frame and dismantling the existing the cement concrete wall and tar road surface around the manholes using for raising the manhole with 1:2:4 (25 mm height 30cm height) including centering inside the manhole laying 15cm thick cement concrete 1:2:4(one cement two sand four aggregates) with 20mm granite chips for finishing the top surface of manhole etc., complete
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
P72.pdf
Tender Documents • 0.77 MB
BOQ_770688.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid