| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance 35 1 B M 1ST BYE LANE CHAPDANI HOOGHLY 712222 | CHAPDANI | HOOGHLY | WEST BENGAL | 712222 | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.9 Cr+₹25.5 L (4.48%)Admitted-Finance | ₹5.9 Cr+₹25.5 L (4.48%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 Cr+₹31.1 L (5.47%)Admitted-Finance | ₹6.0 Cr+₹31.1 L (5.47%) | L3 | Admitted-Finance |
| 4 | L3₹6.0 Cr+₹31.1 L (5.47%)Admitted-Finance | ₹6.0 Cr+₹31.1 L (5.47%) | L3 | Admitted-Finance |
| 5 | L4₹6.1 Cr+₹42.3 L (7.44%)Admitted-Finance BOGRAM KARNAJORA RAIGANJ DIST UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | ₹6.1 Cr+₹42.3 L (7.44%) | L4 | Admitted-Finance |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
11 Feb 2026, 11:00 amClosed
SUBHASIS DASSARKAR/ Sr. Superintending Engineer
Uttarkanya, Annex Building, Fulbari, Jalpaiguri
Construction of Toilet Block for Female in various Tea Gardens of Siliguri Block, in the District of Darjeeling. (Phase-II)
2026_NBDD_991933_2
NBDD/BS/Sr. SE/ NIe-T- 73/2025-26 (Sl. No. 01 to 02)
Open Tender
CIVIL WORKS
Percentage
365 days
Darjeeling
Please refer Tender documents.
7 documents required · 7 mandatory
₹11.2 L
Yes
18 Feb 2026
21 Jan 2026
13 Feb 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of
soil (including mixed soil but excluding laterite or sandstone) including
removing, spreading or stacking the spoils within a lead of 75 m. as
directed. The item includes necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom, bailing out water as
required complete.
(a) Depth of excavation not exceeding 1,500 mm, | 1,176 | %Cum | 14,214.6 | ₹1,67,16,367.95 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in
layers not exceeding 150 mm. including watering and ramming etc. layer
by layer complete.
(a) With earth obtained from excavation of foundation | 294 | % cu.m | 9,241.22 | ₹27,16,917.86 |
| 3 | Filling in foundation or plinth by fine sand in layers not exceeding 150
mm. as directed and consolidating same by thorough saturation with
water ramming complete, including the cost of supply of fine sand.(Payment to be made on measurement of finished quantity). | 963.9 | %Cum | 89,854.57 | ₹8,66,10,819.25 |
| 4 | Single brick flat soling of picked jhama bricks including ramming and
dressing bed to proper level and filling joints with powdered earth or
local sand.
i) In Ground Floor | 1,772.82 | Sqm | 386.14 | ₹6,84,562.39 |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof
course or below flooring or roof terracing or in foundation or in foundation trenches.
i) In Ground Floor | 2,509.5 | Sqm | 28.6 | ₹71,779.73 |
| 6 | Cement concrete with graded stone ballast (40 mm. size) excluding
shutterinq.
(a) 6:3:1 proportion
(A) In Ground floor
With N.B. Variety Stone metal | 55.02 | Cum | 4,259.66 | ₹2,34,366.5 |
| 7 | Ordinary Cement Concrete (mix 1:2:4) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement, If any, in ground
floor. as per relevant JS codes.
(a) Pakur Variety. | 181.02 | Cu.m | 6,219.03 | ₹11,25,768.25 |
| 8 | 25 mm. thick damp proof with cement concrete (1 :1.5:3) (with graded
stone aggregate 10 mm. normal size) and painting the top surface with a
coat of bitumen [VG.40] using 1. 7 kg. per sq.m. including heating the
bitumen and cost and carriage of all materials complete. [ Bitumen! to
be supplied by the Agency] | 244.44 | Sqm | 320.59 | ₹78,366.05 |
| 9 | Controlled Cement concrete with well graded stone chips (20mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS :
456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge.
Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula.
(i) Pakur Variety
(b) M 25 Grade
In ground Floor and Foundation (using concrete mixture) | 742.98 | Cum | 7,416.09 | ₹55,10,010.03 |
| 10 | Ordinary Cement concrete (mixl:1.5:3) withgraded stone
chips (20 mm nominal size) excluding shuttering and
reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety | 14.32 | Cum | 6,831.72 | ₹97,843.89 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.03 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 1.00 MB
BOQ_2425892.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .