Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
5 Dec 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Gautham D P
E & P South, Bharat Petroleum Corporation Limited
Kindly go through the tender documents
8444
1000396828
Single Tender
Buy
E & P South
6 Dec 2022
1 Dec 2022
5 Dec 2022
1 Dec 2022
5 Dec 2022
1 Dec 2022
1 Dec 2022 - 5 Dec 2022
STANDARD PAYMENT TERMS FOR WORKS CONTRACTS
The payment terms given below are subjected to the following conditions:
a. Monthly progressive payments shall be made towards the work completed as
per the payment terms and as per agreed rates, against running account bills
submitted by the contractors.
b. There will be a deduction of 10% towards retention amount from every running
account bill which may be released against equivalent performance bank
guarantee on completion of jobs.
c. Necessary deductions shall be made towards income tax, works contract tax
etc. as applicable as per terms of contract.
d. All bank charges towards Demand draft, payment through banks etc. if any
shall be borne by the contractor.
90% on completed individual item of work.
10% on completion of all jobs and final acceptance by site in-charge
2.1 Fabrication & erection of tanks (U/G & A/G)
20% after completion of cutting, rolling and fabrication
20% after erection
40% after welding and radiography
10% after hydro testing calibration and other tests
10% on completion of all Jobs and Final acceptance by site in-charge
2.2 Supply, Fabrication & erection of LPG Bullets
5% of the total order value on approval of drawings and design calculations
for vessel from TPIA/CCOE/owner and submission of bank guarantee for
equipment amount valid till completion of job.
Cost of steel plates
85% of the cost of steel plates will be paid on receipt of Plates at the
contractor’s works all identification of the same by TPIA on prorate weight basis
and on furnishing bank guarantee for 100% value of steel Plates valid till
completion of job.
Fabrication, erection and transportation
30% of cost of fabrication and erection and cost of transportation after
fabricating the sections at shop and against proof of dispatch of materials.
25% of cost of fabrication and erection and cost of transportation after
assembly, welding, stress relieving of bullet, fixing and welding of saddle
20% of cost of fabrication and erection and cost of transportation after
erection on the foundation.
10% of cost of fabrication and erection and cost of transportation after hydro
testing and painting of bullets Balance 10% of total contract value after
completion of all Jobs, handing over of bullets with all studs, nuts, bolts, gaskets
etc. and submission of final acceptance certificate of TPIA and documentation as
specified in the tender to the owner including CCOE approved “M built drawings”.
100% after supplying, installation and acceptance by site in-charge
2.4 Structural steel works
60% after supply, inspection, acceptance of material and fabrication
20% after erection and welding
20% on completion of all works and final acceptance by site in-charge
2.5 Painting works
30% after surface preparation and application of one coat of primer
30% after second coat of primer for each tank
40% after application of finish paint, completion of all works and acceptance
2.6 Gas Monitoring system (GMS) In LPG
60% after receipt and acceptance of materials at site
20% after erection
20% on completion, testing, commissioning and final acceptance of the
50% after completion of fabrication
30% on completion of erection including provision of supports, vents, drains
etc., alignment and welding including completion of radiography and other
examinations as specified
20% after lines are flushed, pressure tested and finally accepted in all
respects by site in charge
2.8 Equipment erection (supply In contractor’s scope)
80% on supply and erection of equipment
20% on completion, testing, commissioning and final acceptance
2.9 Conveyor system in LPG plant
60% after supply and acceptance of materials at site
20% after erection
20% on completion, testing, commissioning and final acceptance
2.10 Fire protection
2.10.1 Pipelines
50% after completion of fabrication
30% after erection Including provision of supports, vents, drains etc.
alignment and welding including completion of radiography and other
examinations as specified
20% after lines are flushed, pressure tested and finally accepted in all
respects by site In charge
2.10.2 Instrumentation/equipments
60% after receipt and acceptance of materials at site
20% after erection
20% on completion, testing, commissioning and final acceptance of the
2.10.3 MV spray system
50% on design approval and supply of materials as per approval BOM
30% after erection
20% on completion, testing, commissioning and final acceptance of the
80% of agreed rates on supply and laying
20% of agreed rates on completion, testing, commissioning and final
3.0 Electrical/instrumentation/automation works
3.1 Instrumentation works
80% of agreed rates on receipt of materials and installation at site
20% of agreed rates on completion, testing, commissioning and final
3.2 Automation works
60% of agreed rates on factory acceptance test and receipt of materials at
20% of agreed rates after erection
20% of agreed rates on completion, testing, commissioning and final site
3.2.1 Control Room automation job
1. For supply & erection items
¾ 70% of agreed rates on factory acceptance and receipt of material
¾ 10% of agreed rates after erection.
¾ 5% of agreed rates after completion of trail run for 15 days . BPCL
will release the amount incase trail run could not be done within
days from the date of erection against submission of performance
bank guarantee of equivalent amount with validity of 18 months .
¾ 15% of agreed rates after completion of testing, commissioning and
final site acceptance and completion of following activities
I) Supply of spares as per list
II) Back to back warranty for two years from the date of
system hand over from OEM for major items as per list.
III) Placement of competent resident engineer at site.
IV) Written guarantee from the TAS vendor for
comprehensive warranty and continued back up support
for the entire system for 10 years from the date of system
V) Handing over of 3 sets of final documents as per the list
2. For design engineering / FAT/SAT/training/documentation &
commissioning items only
¾ 85% of agreed rates on completion of activity
¾ 15% of agreed rates after completion of testing, commissioning and
final site acceptance and completion of following activities
I) Supply of spares as per the list
II) Back to back warranty for two years from the date of
system hand over from OEM for major items as per the
III) Placement of competent resident engineer at site.
IV) Written guarantee from the TAS vendor for two years
comprehensive warranty and continued back up support
for the entire system for 10 years from the date of
system hand over
V) Handing over of 3 sets of final documents as per the list
1. Rest of the payment terms as per the original bid document remains same
2. In the event of delay beyond three months from the date of
supply/erection, due to reasons not attributable to the TAS vendor, the
respective part payment against sat/commissioning will released on
submission of PBG of equivalent amount with 18 months of validity .
Payment for supply of materials will be released only on production of
routine test certificates, CCE approval; un priced shipping document (for
imported materials), OIML/ W&M approval where ever applicable
3.3 HT & LT works & other Jobs
3.3.1 For supply of items by contractor
60% of agreed rates on receipt and acceptance of materials at site ‘
20% of agreed rates after erection
20% of agreed rates on completion, testing, commissioning and final
3.3.2 For supply of Items by BPCL
80% of agreed rates after erection
20% of agreed rates on completion, testing, commissioning and final
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8444.pdf
pdf • 1.01 MB
BUDGETDOC_8444.pdf
pdf • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .