Tender Value
₹16.5 L
EMD Value
₹12,500
Closing Date
19 Oct 2026, 5:30 pm
CMO Nagar Parishad Rau
Office of Nagar Parishad Rau
Construction of RCC Drain in ward 03 Jhulelal Nagar Rau
2026_UAD_537103_1
1985
Open Tender
Civil Works - Others
Percentage
360 days
Rau
10 documents required · 10 mandatory
₹2,000
₹12,500
18 Sept 2026
18 Sept 2026
20 Oct 2026
18 Sept 2026
19 Oct 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 45 | M3 | 786 | ₹35,370 |
| 2 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. All kinds of soil | 360 | M3 | 151 | ₹54,360 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level Cement concrete grade M-10 (Nominal Mix) with 40 mm maximum size of stone aggregate. | 30 | M3 | 4,112 | ₹1,23,360 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size of stone aggregate. | 144 | M3 | 5,435 | ₹7,82,640 |
| 5 | Centering and shuttering including strutting, propping stretching etc. complete for and removal of form work by sheet plate or ply wood shuttering for : Foundations, footings, bases of columns, etc. For mass concrete. | 1,050 | M2 | 160 | ₹1,68,000 |
| 6 | Reinforcemnt for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | 8,625.88 | kg | 58 | ₹5,00,301.04 |
| 7 | Filling by available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 48 | M3 | 89 | ₹4,272 |
| 8 | Transportation By Mechanical means including loading, unloading and stacking where ever necessary. Excavated Earth | 288 | M3 | 92.87 | ₹26,746.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TenderDoc.pdf
Tender Documents • 0.63 MB
BOQ_646164.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .