Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-Finance | ₹11.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11.4 LAccepted-Finance | ₹11.4 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Latha Contractor L1 | Sree Velan & Co L2 |
|---|---|---|---|---|---|
| 1.00 | Maintanence work for table using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR) | 1 | Nos | 11,500 ₹11,500 | 11,600 ₹11,600 |
| 2.00 | Providing file cupboard using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR) | 210 | Sqft | 2,485 ₹5.2 L | 2,495 ₹5.2 L |
| 3.00 | Providing Accounted Partiton using wood materials used for partition skeletal work . fixing edging glass and using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR) | 216 | Sqft | 1,968 ₹4.3 L | 1,975 ₹4.3 L |
| 4.00 | GST. 18% (CGST-9%, SGST-9%) | 1 | Nos | 1,72,518.84 ₹1.7 L | 1,73,187 ₹1.7 L |
Tender Value
₹11.6 L
EMD Value
₹11,600
Closing Date
25 Nov 2025, 3:00 pmClosed
COMMISSIONER VILLUPURAM MUNICIPALITY
VILLUPURAM MUNICIPALITY
Providing Interior Furnishing works Like Partition and file cubboard in Accounted room and general Sections at New Municipal office building.
2025_MAWS_623705_21
8604/2025/E2
Open Tender
Civil Works
30 days
Villupuram Municipality
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹11,600
30 May 2026
18 Nov 2025
25 Nov 2025
18 Nov 2025
25 Nov 2025
18 Nov 2025
Maintanence work for table using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR)
Providing file cupboard using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR)
Providing Accounted Partiton using wood materials used for partition skeletal work . fixing edging glass and using water proof of 19mm thick over which laminated sheet of 1 mm thick fixed using along with necessary furniture fittings such as hydraulic hinges, locks, handles, etc.,as directed by the departmental officers. the rate inclusive of cost of materials and labour, etc., complet.(LR)
GST. 18% (CGST-9%, SGST-9%)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_746460.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid