| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.8 L+₹44,019.70 (33.6%)Rejected-Finance VILLAGE PO LAHRU TEHSIL BHATTIYAT DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.8 L+₹53,454.20 (40.8%)Rejected-Finance HOUSE NO 18 1 DHOBIGHAT ROAD NEAR DC OFFICE WARD NO 12 SOLAN DISTT SOLAN H P 173212 | SOLAN | SOLAN | HIMACHAL PRADESH | 173212 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ROHIT VERMA L3 | Puran Singh L2 | Dilbag Singh L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling/wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in-Charge | 40.2 | cum | 475 ₹19,095 | 400 ₹16,080 | 300 ₹12,060 Lowest |
| 2.00Providing Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) PE-80, PN-4 of following diameter and class confirming to IS 4427-2:2007 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge (Earth work in trenches to be measured and paid separately) | ||||||
| 2.10 | 160mm x 4.00 Kg/cm² | 80 | rmt | 495 ₹39,600 | 475 ₹38,000 Lowest | 600 ₹48,000 |
| 3.00 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work n foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 0.3 | cum | 7,000 ₹2,100 | 6,800 ₹2,040 | 4,800 ₹1,440 Lowest |
| 4.00Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete work in:- | ||||||
| 4.10 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge | 36.18 | sqm | 450 ₹16,281 | 350 ₹12,663 | 260 ₹9,406.8 Lowest |
| 5.00 | Providing and laying cement concrete 1:2.4(1 cement 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work In Walls (any thickness but not exceeding 0.10 meter thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge | 2.55 | cum | 9,650 ₹58,672 | 9,800 ₹59,584 | 4,800 ₹29,184 Lowest |
| 6.00 | Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) with 15 % plums and curing complete excluding cost of form work in Retaining wall/ Breast walls. The size of plum shall usually be 150 mm to 300 mm as per PWD specification within all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge | 6.08 | cum | 6,800 ₹41,344 | 6,500 ₹39,520 | 4,200 ₹25,536 Lowest |
| 7.00 | Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge. | 76.5 | kg | 96 ₹7,344 | 93 ₹7,114.5 | 70 ₹5,355 Lowest |
Tender Value
₹1.8 L
EMD Value
₹3,640
Closing Date
21 Oct 2025, 11:30 amClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION CHOWARI
Remodelling of FIS to Lahru in tehsil Bhattiyat Distt Chamba HP SH Providing Laying and Jointing HDPE pipe 160mm dia at RD 880 to 960 802 Rmt at sliding portion and Co RCC supporting pillars 7 No and Co Edge Wall at RD 2200 660 to 690 30 rmt
2025_HPIPH_117383_1
NIT NO 7837-7936 DATED 09-10-2025
Open Tender
Civil Works - Water Works
Item Rate
60 days
CHOWARI CHAMBA HP
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹3,640
22 Dec 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
10 Oct 2025 - 21 Oct 2025
Amount
Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling/wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in-Charge
Providing Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) PE-80, PN-4 of following diameter and class confirming to IS 4427-2:2007 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge (Earth work in trenches to be measured and paid separately)
160mm x 4.00 Kg/cm²
Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work n foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge.
Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge
Providing and laying cement concrete 1:2.4(1 cement 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work In Walls (any thickness but not exceeding 0.10 meter thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge
Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) with 15 % plums and curing complete excluding cost of form work in Retaining wall/ Breast walls. The size of plum shall usually be 150 mm to 300 mm as per PWD specification within all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge
Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge.
Puran Singh (BID ID -569716)
ROHIT VERMA (BID ID -571482)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_171602.xls
BOQ • 0.28 MB
F68.pdf
Tender Documents • 1.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .