| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 CrAccepted-AOC 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹20.1 Cr Quoted ₹20.3 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹21.2 CrRejected-AOC 53 19 BRINDABON MULLICK LANE KADAMTALA HOWRAH WEST BENGAL 711101 UDYAM WB 08 0004810 19AEBPC0017L2ZW R M MII STATUS AS VERIFIED | HOWRAH | WEST BENGAL | 711101 | ₹21.2 Cr | L2 | Rejected-AOC Quoted L2 rate |
| Sl No | Description | Qty | Unit | PHOENIX & CO L2 | V.JANARTHANAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL (Boulders with Pebbles) | 2,017.8 | Cu.m | 135 ₹2.7 L | 129 ₹2.6 L |
| 2.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for (OPEN FOUNDATION, CUT OFF WALL) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL) | 2,297.6 | Cu.m | 504 ₹11.6 L | 481 ₹11.1 L |
| 3.00 | Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 1,470.46 | Cu.m | 637 ₹9.4 L | 608 ₹8.9 L |
| 4.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for TOE / CUT OFF WALL. | 3,797.06 | Cu.m | 504 ₹19.1 L | 481 ₹18.3 L |
| 5.00 | Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (Below Footing, Below Raft foundation, Below Retaining Wall,Base Course for Apron &Approach slab) | 91.9 | Cu.m | 5,537 ₹5.1 L | 5,286 ₹4.9 L |
| 6.00 | Vibrated Plain Cement Concrete of grade M 20 grade, using 40mm,20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for cut off wall concrete | 543.43 | Cu.m | 6,995 ₹38.0 L | 6,677 ₹36.3 L |
| 7.00 | Vibrated Cement Concrete of grade M 15 Nominal Mix using 40mm,20mm &10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RIGID APRON. | 1,536.24 | Cu.m | 5,537 ₹85.1 L | 5,286 ₹81.2 L |
| 8.00 | Vibrated Cement Concrete of grade M 20 Design Mix using 40mm,20mm &10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RIGID APRON. | 1,536.24 | Cu.m | 5,906 ₹90.7 L | 5,637 ₹86.6 L |
| 9.00 | Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing under ABUTMENT and Returns AND PIERS | 1,380.27 | Cu.m | 10,316 ₹1.4 Cr | 9,847 ₹1.4 Cr |
| 10.00 | Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Abutment /Pier/ Wing wall below Sill level | 107.06 | Cu.m | 10,591 ₹11.3 L | 10,109 ₹10.8 L |
Tender Value
₹19.9 Cr
EMD Value
₹19.9 L
Closing Date
2 Sept 2025, 3:00 pmClosed
Project Director
DRDA Perambalur
Construction of 1 Bridge in Veppur Block under State Special Assistance Phase I 2025-26 in Perambalur District Package No.TN11-01
2025_RDTN_587042_1
DIPR/3980/TENDER/2025 Dated 30.07.2025
Open Tender
Civil Works - Bridges
365 days
Perambalur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19.9 L
DRDA Perambalur
13 Nov 2025
1 Aug 2025
2 Sept 2025
1 Aug 2025
2 Sept 2025
1 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid