| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC L1- Firm |
| 2 | L2₹3.8 Cr+₹3.0 L (0.81%)Rejected-AOC C 20 GAUR GRACIOUS KANTH ROAD MORADABAD | MORADABAD | UTTAR PRADESH | ₹3.8 Cr+₹3.0 L (0.81%) | L2 | Rejected-AOC L2- Firm |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
13 Mar 2026, 1:00 pmClosed
General Manager Zone-2
General Manager, Zone-2, U.P. Projects Corporation Ltd. 14, Chandra Shekar Nagar Colony, Tulasherpur, Bareilly
Construction of Indor Mini Stadium at PM Shri Govt. Girls Inter College Jhalu, District Bijnor (U.P.)
2026_UPPRC_1121384_2
25/PCL/GM/ZONE-2/BLY/2025-26
Open Tender
Civil Works
Percentage
450 days
Jhalu, District Bijnor (U.P.)
As per BID Document
2 documents required · 2 mandatory
₹17,700
₹7.5 L
12 May 2026
28 Feb 2026
13 Mar 2026
28 Feb 2026
13 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. | 883.39 | CUM | 123.94 | ₹1,09,487.36 |
| 3 | same as above item but for 1.5m to 3.0m. depth | 45.09 | CUM | 212.48 | ₹9,580.72 |
| 4 | Excavating, supplying, stacking and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 606.69 | Cum | 489.13 | ₹2,96,750.28 |
| 5 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. | 204.11 | CUM | 4,756.48 | ₹9,70,845.13 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 170.8 | CUM | 1,482.91 | ₹2,53,281.03 |
| 7 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,779.97 | SQM | 216.5 | ₹3,85,363.51 |
| 8 | Providing & laying in position machine batched and machine. Mixed design mix M-25 grade cement concrete for reinforcement cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying Excluding the cost of centering, shuttering , finishing and but excluding reinforcement , including admixtures in recommended proportion as per IS : 9103 to acclerate, retarder for setting of concrete/ improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note :- Cement content considered in this item @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately.R.C.C. work Upto plinth Lvl. (M-25) Plinth band /footing/Column | 326.83 | CUM | 6,636.69 | ₹21,69,069.39 |
| 9 | Providing & laying in position machine batched and machine. Mixed design mix M-25 grade cement concrete for reinforcement cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying Excluding the cost of centering, shuttering , finishing and but excluding reinforcement , including admixtures in recommended proportion as per IS : 9103 to acclerate, retarder for setting of concrete/ improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note :- Cement content considered in this item @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately.R.C.C. work Above plinth Lvl. (M-25) Lintal /Slab/ Beam / Column | 378.8 | CUM | 6,885.02 | ₹26,08,045.58 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 897 | QTL | 7,530.63 | ₹67,54,975.11 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.98 MB
BOQ_2086553.xls
BOQ • 0.67 MB
BIDPMSHREE_2.pdf
Tender Documents • 19.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .