Loading…
Loading…
Tender Value
₹72.2 L
EMD Value
₹1.4 L
Closing Date
24 Aug 2026, 9:00 amDue today
DSCO Gurdaspur
Room No. 401 402 Third Floor Block B District Administration Complex Gurdaspur
Soil Erosion Land protection work Crate Wire Structure Retaining Wall Water Harvesting Tank
2026_DOA_173204_1
DSWC/GUR/2026-2027/09
Open Tender
Civil Works
Item Rate
90 days
Dharkalan
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.4 L
7 Aug 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-2027/09
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
Stone Masonry Land Protection Structure/ Soil Erosion Land, Village Phagli, Lehroon, Bhanguri and Rogh Tehsil Dharkalan, Distt. Pathankot.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 7223900
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :-Soil Erosion Land Protection Work, Village Phagli Tehsil Dharkalan, Distt. Pathankot.
Est. No. D.B, dated Amount 2087200 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture (Wall Painting) Total
1 Rain Water Harvesting Tank-1 173994 324672 1500
2 Crate wire Structure 537047 294461 0
3 Retaining Wall 88616 166747 0
4 Rain Water Harvesting Tank-2 173994 324672 1500
COST OF MATERIAL (RWHT)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 197 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.69 cum 1017.79 per cum
3 Cost of Stone Aggregate 11.26 cum 605.12 per cum
4 Cost of Bajri 1.65 Cum 700.31 per cum
5 Cost of Boulder 03 tp 18 Kg 95.7 cum 759.02 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 234.57 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 11.37 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 36 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 51 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 1.83 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 71.2 sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 379.5 cum 923.07 per cum
2 Cost of G.I crate wire (including GST) 2615.8 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 148.5 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1189 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1189 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 379.5 cum 338.17
COST OF MATERIAL (Retaining Wall)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 96 Bags 299.99 per bag with gst
2 Sand 16.67 cum 1017.79 per cum
3 Bajri 0.54 cum 700.31 per cum
4 Stone 3.96 Cum 605.12 per cum
5 Gatka 52.8 cum 759.02 per cum
COST OF LABOUR (Retaining Wall)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 20 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 4 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 16 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 32 cum 2999.31
5 D.P.C.1:2:4 top of Wall 0.6 Cum 1396.94
COST OF MATERIAL (RWHT)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 197 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.69 cum 1017.79 per cum
3 Cost of Stone Aggregate 11.26 cum 605.12 per cum
4 Cost of Bajri 1.65 Cum 700.31 per cum
5 Cost of Boulder 03 tp 18 Kg 95.7 cum 759.02 per cum
COST OF LABOUR (RWHT)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 234.57 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 11.37 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 36 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 51 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 1.83 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 71.2 sqm 159.08
WORK-2:- Soil Erosion Land Protection Work, Village : Lehroon , Tehsil Dharakalan Distt. Pathankot.
Estimate Sanction No. /D.B. Dated 2026, Amount 732200 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall 258824 473385 -
COST OF MATERIAL (Retaining Wall)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 272 Bags 299.99 per bag with gst
2 Sand 47.31 cum 1054.82 per cum
3 Bajri 10.49 cum 644.1 per cum
4 Stone 1.43 Cum 738.84 per cum
5 Gatka 151.58 cum 788.43 per cum
COST OF LABOUR (Retaining Wall)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 45.6 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 10.6 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 53 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 84.8 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 1.59 Cum 1396.94
WORK-3 :-Stone Masonary Land Protection Sturcture/ Soil Erosion Land , Village Bhanguri, Tehsil Dharkalan, Distt. Pathankot.
Est. no. /D.B, dated , Amount 510300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate wire Structure 330652 179689 -
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 229.5 cum 942.89 per cum
2 Cost of G.I crate wire (including GST) 1600.5 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 102 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 727.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 727.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 229.5 cum 338.17
WORK-4 :-Soil Erosion Land Protection Work, Village Rough Tehsil Dharkalan, Distt. Pathankot.
Est. No. D.B, dated Amount 3894200/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture (Wall Painting) Total
1 Rain Water Harvesting Tank 171233 324672 1500
2 Crate wire Structure-1 282711 159377 0
3 Crate wire Structure-2 207881 115698 0
4 Crate wire Structure-3 320112 178475 0
5 Crate wire Structure-4 132226 73847 0
6 Crate wire Structure-5 132226 73847 0
7 Retaining Wall-1 89882 107432 0
8 Crate wire Structure-6 138784 78399 0
9 Crate wire Structure-7 282535 157550 0
10 Retaining Wall-2 170493 292509 0
11 Crate wire Structure-8 257503 145311 0
COST OF MATERIAL (RWHT)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 197 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.69 cum 997.39 per cum
3 Cost of Stone Aggregate 11.26 cum 586.67 per cum
4 Cost of Bajri 1.65 Cum 681.41 per cum
5 Cost of Boulder 03 tp 18 Kg 95.7 cum 739.84 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 234.57 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 11.37 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 36 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 51 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 1.83 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 71.2 sqm 159.08
Crate Wire Structure-1,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 198 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 1455.3 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 82.5 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 661.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 661.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 198 cum 338.17
Crate Wire Structure-2,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 148.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 1026.3 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 66 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 466.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 466.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 148.5 cum 338.17
Crate Wire Structure-3
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 229.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 1580.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 102 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 718.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 718.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 229.5 cum 338.17
Crate Wire Structure-4
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 94.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 656.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 42 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 298.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 298.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 94.5 cum 338.17
Crate Wire Structure-5
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 94.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 656.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 42 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 298.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 298.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 94.5 cum 338.17
Retaining Wall-1
COST OF MATERIAL (Retaining Wall)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 133 Bags 299.99 per bag with gst
2 Sand 18.09 cum 997.39 per cum
3 Bajri 14.92 cum 586.67 per cum
4 Stone 8.35 Cum 681.41 per cum
5 Gatka 23.65 cum 739.84 per cum
COST OF LABOUR (Retaining Wall)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 5.38 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 15.07 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 3.58 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 17.92 cum 2999.31
5 D.P.C.1:2:4 top of Wall 9.28 Cum 1396.94
Crate Wire Structure-6
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 97.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 710.6 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 48 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 323 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 323 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 97.5 cum 338.17
Crate Wire Structure-7
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 202.5 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 1395.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 90 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 634.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 634.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 202.5 cum 338.17
Retaining Wall-2
COST OF MATERIAL (Retaining Wall)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 189 Bags 299.99 per bag with gst
2 Sand 32.82 cum 997.39 per cum
3 Bajri 1.24 cum 681.41 per cum
4 Stone 9.11 Cum 586.67 per cum
5 Gatka 101.2 cum 739.84 per cum
COST OF LABOUR (Retaining Wall)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 46 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 9.2 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 55.2 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 36.8 cum 2999.31
5 D.P.C.1:2:4 top of Wall 1.38 Cum 1396.94
Crate Wire Structure-8
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 180 cum 903.12 per cum
2 Cost of G.I crate wire (including GST) 1329.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 75 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 604.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 604.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 180 cum 338.17
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
DNIT09.pdf
Tender Documents • 1.19 MB
99999FB.xls
Tender Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].