| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11.5 L
Closing Date
2 Apr 2023, 12:00 pmClosed
SE
EDC HATHRAS
TURNKY TENDER
2023_DVVNL_789152_1
EDCH-118/2022-23
Open Tender
Electrical Works
180 days
HATHRAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
DVVNL WEBSITE
₹11.5 L
3 Apr 2023
23 Mar 2023
2 Apr 2023
23 Mar 2023
2 Apr 2023
23 Mar 2023
Amount
Supply of Following Matarial as per relevent ISS
PCC 8.5 Mtr Long
STP Pole 13 M Long
STP Pole 11M Long
Stone pad
ACSR Dog Conductor
11 KV XLPE Cable 3x185 sqmm
3x120+1x95+1x16 sq mm AB Cable
3x50+1x35+1x16 sq mm AB Cable
LT PVC Cable AL 3.5*400 sqmm
LT PVC Cable AL 1*400 sqmm
T/F 250KVA 11/.4 Kv New
T/F 400KVA 11/.4 Kv New
11 KV V.C.B Outgoing
GI Pipe 6" Dia
HDPE Pipe Undergrouding Minimum 3 Mtr 160 mm OD PN-4PE-80 Grade U.V Stablized HDPE Pipe as IS:4984 in 6 Metre
11 Kv Cable jointing Kit
Earthing Set Complete
Stay Set Complete
11 KV V type cross Arm Complete
11 KV Pin Insulator with Pin
11 Kv Disc insulator Complete
LT Incoming Panel With Metering Equipment
F bracket
Tee Off Channal
Number Plate
Barbed Wire
Danger Board With Clamp
Guarding Angle Complete
G.I Wire 6 SWG
G.I Wire 8SWG
Suspension Clamp With I hook Complete
Dead End Clamp
3 Phase LT Distribution Box with Holding Clamp
LT Insulation Pearacing Clamp with Pearcing Conn.
Top Channal
Dropper Channal
11 Kv Fuse Set
11 KV TPMO Complete
Clamp for Top & Dropper Channal with N&B
Cross bracing M.S Angle
Clamps with Bolt & Nut
P.G Clamp
LT Piller Box
AL LUG 400 sqmm
Nut, bolt & Washer
Scope of work
Errection and grouting of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
8.5 Mtr. long PCC Poles.
11/13 Mtr. S.T. Poles
Double pole complet fitting
Four Pole with Complete Fiting
Laying, sagging and stringing and Nozzling / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Dog / Racoon Conductor
3*120+3*95 sqmm. AB Cable
3*50+1*35+1*16 sqmm AB Cable
XLPE Cable of size 3*185mmsq
LT PVC Cable AL 3.5*400 sqmm
LT PVC Cable AL 1*400 sqmm
Safe Installation of following New cousted T/F in proper alignment direction & making all HT/LT connection.
400 KVA T/F
250 KVAT/F
Fixing of HDPE Pipe Undergrounding Minimum 3 Mtr 160 mm OD PN-4PE-80 Grade U.V Stablized HDPE Pipe as IS:4984 in 6 Mtr
Fixing of GI Pipe 6" Dia
Fixing of Following Clamps for completion of work
Danger Board
Number Plate
3 Phase LT Distribution Box
11 KV Fuse Set
Fixing of 11 KV Cable Jointing Kit
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Pipe earthing of 250/400 KVA medium Power Transformers
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG/ 8 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Fixing and grouting of LT incomming pannel with metering equipments
Safe Dismantling of following Old & Used T/F with opening of all connection with safe carriage up to JE Store/ESC Hathras (Distance Range 0 to 50 KM)
250KVA T/F
100/63KVAT/F from Double pole
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Safe Dismenteling of old 5 MVA T/F from Foundation and carriage it from switch yard to out side boundary
Fixing and grouting with Earthing of 11 kv VCB Panel
Construction of Plinth Suitable for 10 MVA T/F above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and remaining will be done properly After ballast shall be provided a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Making all H/T/ jumpers of installed New/Repaired 10 MVA T/f after Completion of Work
Earthing of 10 MVA power T/F (Body & Neutral)
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
GANGA ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx