| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹2.4 L+₹6,559.10 (2.79%)Rejected-Finance | ₹2.4 L+₹6,559.10 (2.79%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹2.6 L+₹24,498.54 (10.4%)Rejected-Finance | ₹2.6 L+₹24,498.54 (10.4%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹2.6 L+₹30,019.10 (12.8%)Rejected-Finance | ₹2.6 L+₹30,019.10 (12.8%) | L4 | Rejected-Finance REJECTED |
| 5 | L5₹2.7 L+₹33,446.22 (14.2%)Rejected-Finance | ₹2.7 L+₹33,446.22 (14.2%) | L5 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | S. Baskaran L6 | N.K.Kumaresan L2 | Balachandar L4 | PRB AGENCY L5 | SATHEESH G L3 | D.RAVIKUMAR L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 7.2 | cum | 230 ₹1,656 | 111 ₹799.2 Lowest | 130 ₹936 | 181 ₹1,303.2 | 224 ₹1,612.8 | 126 ₹907.2 |
| 2.00 | Supplying and filling in foundation and basement with M.sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 12.56 | cum | 2,050 ₹25,748 | 1,734 ₹21,779.04 | 1,950 ₹24,492 | 576 ₹7,234.56 Lowest | 2,016.78 ₹25,330.76 | 2,100 ₹26,376 |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 12.56 | cum | 5,400 ₹67,824 | 4,968 ₹62,398.08 Lowest | 5,400 ₹67,824 | 6,056 ₹76,063.36 | 5,509.58 ₹69,200.32 | 5,400 ₹67,824 |
| 4.00 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Landing slabs, Landing beam, Portico beam etc.) | 54 | Sqm | 515 ₹27,810 | 289 ₹15,606 Lowest | 530 ₹28,620 | 491 ₹26,514 | 474.5 ₹25,623 | 370 ₹19,980 |
| 5.00 | Cement concrete 1:3:6 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 5.52 | cum | 6,400 ₹35,328 | 5,634 ₹31,099.68 | 6,300 ₹34,776 | 7,100 ₹39,192 | 5,843.58 ₹32,256.56 | 5,000 ₹27,600 Lowest |
| 6.00 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 9 | cum | 7,350 ₹66,150 | 7,656 ₹68,904 | 7,000 ₹63,000 | 8,250 ₹74,250 | 6,888 ₹61,992 | 6,000 ₹54,000 Lowest |
| 7.00 | Provision for Bitumen Pad | 1.8 | Sqm | 230 ₹414 | 300 ₹540 | 200 ₹360 Lowest | 475 ₹855 | 230 ₹414 | 211.5 ₹380.7 |
| 8.00 | Provision for Name Board | 1 | Sqm | 4,500 ₹4,500 | 3,500 ₹3,500 | 4,500 ₹4,500 | 2,000 ₹2,000 Lowest | 3,400 ₹3,400 | 2,000 ₹2,000 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 41,297 ₹41,297 | 36,833 ₹36,833 | 40,411 ₹40,411 | 40,934 ₹40,934 | 39,569 ₹39,569 | 35,832 ₹35,832 Lowest |
Tender Value
₹2.9 L
EMD Value
₹3,000
Closing Date
6 Jul 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER BP
Panchayat Union Keerapalayam
Providing Cement Concrete Pavement at Mela Theru in Poonthottam Panchayat
2026_RDTN_681809_3
A2/658/2026 -PMAGY-2025-26
Open Tender
Civil Works
Item Rate
90 days
Panchayat Union Keerapalayam
as per Tender
7 documents required · 7 mandatory
₹0
₹3,000
Panchayat Union Keerapalayam
17 Jul 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
19 Jun 2026 - 19 Jun 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 7.2 | cum | - | - |
| 2 | Supplying and filling in foundation and basement with M.sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 12.56 | cum | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 12.56 | cum | - | - |
| 4 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Landing slabs, Landing beam, Portico beam etc.) | 54 | Sqm | - | - |
| 5 | Cement concrete 1:3:6 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 5.52 | cum | - | - |
| 6 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 9 | cum | - | - |
| 7 | Provision for Bitumen Pad | 1.8 | Sqm | - | - |
| 8 | Provision for Name Board | 1 | Sqm | - | - |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_819458.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_819458.xls
BOQ • 0.26 MB
TECHNICALBID.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .