Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.5 L
EMD Value
₹22,350
Closing Date
29 Sept 2022, 4:00 pmClosed
Wildlife Warden Jammu
Jammu
Providing and laying interlocking tiles at Manda Deer Park, Jammu
2022_FD_189156_1
NIT 59 Laying Interlocking Tiles Manda
Open Tender
Civil Works
Item Wise
90 days
Manda Deer Park
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Jammu
₹22,350
1 Oct 2022
20 Sept 2022
30 Sept 2022
20 Sept 2022
29 Sept 2022
20 Sept 2022
Amount
Earth work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottom lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated as directed.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:5:10 (1 Cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size).
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size) and curing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size).
Providing and laying Reinforced cement concrete 1:1.5:3 (1 Cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended loors, balconies, lansings and staircase having upto 15° slope excluding cost of centering and shuttering, all work upto floor V level.
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttering including strutting, propping, etc and removal of form for: Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttering including strutting, propping, etc and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.
Providing and laying 60 mm thick factory made concrete interlocking paver block of M-30 grade by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50 mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per the direction of Engineer-in-charge.
JAVED SOHAIL
TAHIRA BANOO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .