Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC AT BHULI B BLOCK BHULI SUB POST OFFICE BHULI ROAD NEAR SHIV MANDIR BHULI PO BHULI DHANBAD 828104 | DHANBAD | DHANBAD | JHARKHAND | 828104 | L1 | Accepted-AOC RECOMMENDED BY TC |
Tender Value
Refer Docs
EMD Value
₹16,400
Closing Date
28 Mar 2023, 11:00 amClosed
GM (Excavation) , Dudhichua Project
Office of the GM (Excavation) , Dudhichua Project PO Khadia ,Distt. Sonebhadra, UP - 231222
Off loading work towards Providing manpower support in 85Te Dumper Workshop for store related works for 600 days at Dudhichua Project
2023_NCL_274806_1
DCH/GM (Excv)/Tender /85 Te/2022-23/68
Open Tender
Excavation Department Work
Item Rate
730 days
NCL, DUDHICHUA PROJECT
Please refer Tender documents
5 documents required · 5 mandatory
₹16,400
17 Apr 2023
13 Mar 2023
29 Mar 2023
13 Mar 2023
28 Mar 2023
14 Mar 2023
13 Mar 2023 - 21 Mar 2023
Amount
SCOPE OF WORK • Collection of burnt oil from various dumpers under maintenance or break-down, from trolley to empty drums. (2 drums brunt oil is being collecting per day at 85Te Dumper Section) • Loading of brunt oil drums & empty drums on departmental truck through manual ramp. • Unloading B/O drums and empty drums at RS/DCH for returning/ deposition. • Bringing fresh lubricants & coolant drums (3 drums per day average) from RS/DCH to Section. • Collecting old scrap spares of section and old oil filters etc. and depositing to RS/DCH. • Bringing new spares material issued from RS/DCH to 85T Section. • Keeping site store area of 85T Section neat & clean. Note : • The work-men to be deployed for this work should be provided with all safety gadgets, like – helmet, safety shoes, etc. and VTC training by the contractor prior to deployment for work. • Firm has to provide minimum 03 (Three) nos. unskilled manpower per day in G-shift. • Firm has to provide to and fro transportation of their manpower up to the work place.
Total Labour charge with contractor profit (Exclusive of GST) for complete job as per SCOPE OF WORK & NIT
Total CMPF/EPF and Pension (exclusive of GST) for complete job as per SCOPE OF WORK & NIT
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_284418.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .