| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-Finance | ₹3.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.1 CrRejected-Finance 2486 CHURKHI ROAD PATEL NAGAR ORAI JALAUN UTTAR PRADESH 285501 | ORAI | JALAUN | UTTAR PRADESH | 285501 | ₹3.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.4 CrRejected-Finance | ₹3.4 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹4.5 Cr
EMD Value
₹24.5 L
Closing Date
24 Mar 2026, 12:00 pmClosed
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Widening work at Km 17, 18, and 19 (060) of Ait Bangra-Bhikhepur Road (SH-152)
2026_CEJNS_1126635_1
1659/ 44 C- Jhansi Circle/2025 Date 07.03.2026
Open Tender
Civil Works - Roads
365 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,450
₹24.5 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
9 Apr 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
19 Mar 2026
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Morth specification 301 Sr. 3.06
Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Compaction Only) as per Morth specification 305 Sr. 3.17
By Mix in Place Method Construction of granular sub-base (Grade-I) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per Morth specification 401 Sr. 4.01
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per Morth specification 406 Sr. 4.14
Prime Coat over WMM/WBM Providing and applying primer coat with SS-1 Bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per Morth specification 502 Sr. 5.01(A)
Dense Graded Bituminous Macadam (Grading-I with VG-30) Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. as per Morth specification 505 Sr. 5.4 (A)
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. ENC Circular No.
Bituminous Concrete (Grading 2 With VG-30) Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects as per Morth specification 507 Sr. 5.05 (B)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Earth work in excavation in B.C. Soil in foundation of abutment, wing wall, retaining wall etc. in black cotton soil in Bundelkhand area requiring use of special T&P including lift upto 1.5 mtr and lead upto 30 mtr for completion of work including levelling
Sand filling in foundation of 1.25 FM including supply of material, labour T&P etc. compete
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M-15 (1:2:4)
Providing and laying RCC Grade M-25 as per Morth specification
Mild steel for iron in plain work such as reinforced concrte or reinforced brick work wrough to required shape as necessary including being for proper completion of work and including supply of all steel and wastage and wastage & overlapping & hooks. S.I.
Providing and laying PCC Grade M-20 as per Morth specification 12.8
Supply & laying of PV.C pipe 110 mm dia for weep holes including cost of all material T&P etc. required for proper completion of work.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Supply of 1000 mm dia NP-4 hume pipe cost of all material, loading, unloading, stacking, cartage etc. for completion of work.
Providing & fixing Km. stone & their Painting & Letter's Writing et.c. Km Stone
Providing & fixing Hectometre Stone, & their Painting & Letter's Writing et.c. Hectometer Sotone
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st Year maintinence cost (0.00% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd Year maintinence cost (0.25% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd Year maintinence cost (0.50% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th Year maintinence cost (0.75% Construction Cost)
The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th Year maintinence cost (1.00% Construction Cost)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2101065.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
T2.pdf
Tender Documents • 1.28 MB
BOQ_2101065.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid