| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 LAccepted-AOC | L1 | Accepted-AOC AWARD OF CONTRACT | |
| 2 | L2₹48.3 L+₹90,439 (1.91%)Rejected-Finance CHAMAVILA CHEELI CHITTADI POST PALAKKAD DIST KERALA 678706 | PALAKKAD | KERALA | 678706 | L2 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 3 | L3₹49.0 L+₹1.6 L (3.39%)Rejected-Finance 5 127 16 GANESH GARDEN KADAMPADI SULUR COIMBATORE TAMILNADU 641401 | COIMBATORE | TAMIL NADU | 641401 | L3 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 4 | L4₹49.9 L+₹2.6 L (5.46%)Rejected-Finance 121004 | L4 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 5 | L5₹50.6 L+₹3.3 L (6.88%)Rejected-Finance | L5 | Rejected-Finance BEING NOT LOWEST TENDER |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
10 Oct 2023, 6:00 pmClosed
GE AF SULUR
Garrison Engineer AF Sulur Military Engineer Services Kangayampalayam Post Sulur Coimbatore 641 401
SPECIAL REPAIR TO VIP DISPERSAL AT AIR FORCE STATION SULUR
2023_MES_619336_1
8612/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
GE AF SULUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
GE AF SULUR
₹96,000
Yes
21 Oct 2023
18 Sept 2023
11 Oct 2023
18 Sept 2023
10 Oct 2023
4 Oct 2023
18 Sept 2023 - 29 Sept 2023
Amount
SCHEDULE A BOQ
Note for all items of this BOQ :-
SITE FOR EXECUTION OF WORK :- Tenderer shall note that entire work shall be executed at Runway / taxi track/ Tarmac/dispersal & around of airfield area.
Due to continuous Flying commitment at Sulur Station, site for execution of work will be available only on Saturday, Sunday, Holiday and non flying days as decided by the ATS authorities.
The tenderer has to arrange his working programme accordingly.
The tenderer has to liaise with the ATS authorities two days prior of his planned works and schedule accordingly. Even though prior permission obtained, the work may be interrupted/stopped in half way if there any causes like emergency landing etc.
No claim on account of not giving the entire site after award of work or giving the site in piecemeal manner will not be entertained by the department at any stage.
The quoted rates shall be deemed to be inclusive of above mentioned aspects.
Demolition of existing un-reinforced Cement Concrete in ground floors and pavings not exceeding 15 Cm thickness complete all as specified and directed.
Removal of demolished material to a distance exceeding 1.50 Km and not exceeding 5.00 Km and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed.
M & L for providing & laying Dry Lean Cement Concrete (DLC) 100 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 Mpa. Minimum cement content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting using high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and tolerances to be as per Table 900-1 of MoRTH specifications for Road and Bridge work 2013.
Note for Item No 11 :- No price adjustment shall be applicable if excess quantity of cement than the minimum is used/ approved based on mix design in the execution of work under this item.
M & L Pavement Quality Cement Concrete (PQC) of minimum 28 days field Flexural strength of 45Kg /Sqcm or 4.5 Mpa, aggregate gradation as per Table 3 of IRC 15-2017, coarse aggregate of clean, hard strong, dense, non-porous and durable pieces of crushed stone or gravel, fine aggregates of clean natural sand or crushed stone sand or combination of both using minimum 360 Kg/cum of cement with non-circular, virgin synthetic fibre of 12-18 mm length, specific gravity 1.34 to 1.39, UV stable, alkali resistant, with equivalent dia 15-40 micron, minimum melting temperature as 240°C and minimum tensile strength of 300 Mpa and at the rate as specified by the manufacturer. PQC laid, spread and compacted with slip-form paver of minimum 7.50m width, including curing and tining by Texturing cum Curing Machine complete all as specified and directed. Required surface texturing to be done as specified in Clause 10.1.14 and Table 9 of IRC:15-2017.
Note for item No 13 :- (a) Construction Joints/dummy joints and expansion joints shall be measured and paid separately under respective items.
(b) Deduction shall be made in computing concrete quantity for expansion joints.
(c) Contractor shall consider 360 kg of cement per cum of concrete while quoting this item. Actual quantity of cement shall be used as per approved design mix. No price adjustment shall be applicable for excess quantity of cement content i.e beyond 360 kg as per approved design mix in execution of work
(d) Non circular synthetic fibre shall be mixed in the " PQC" @ 0.25% of cement all as per manufacturers instructions and as directed by Engr-in-charge.
(e) Supply only of POLYESTER TRIANGULAR/non circular synthetic fibre shall be measured and paid separately.
(f) Cost of brooming and belting shall be measured and paid seperately.
(g) Cost of steel formwork and testing as specified shall be deemed to be included in the rate quoted by the tenderer
(h) Maximum working temperature shall not exceed 30 degree centigrade of atmosphere.
(j) Supply only of POLYESTER TRIANGULAR/non circular synthetic fibre shall be measured and paid separately.
(k) Cost of brooming and belting are deemed to be inclusive in quoted rate
(l) Cost of steel formwork and testing as specified shall be deemed to be included in the rate quoted by the tenderer.
(m) Maximum working temperature shall not exceed 30 degree centigrade of atmosphere.
Supply only polyester triangular/Non circular synthetic fibre for pavement quality concrete PQC surface complete all as specified and directed.
S & F one layer of polythene film (transparent colour) 400 micron thickness as per ASTM D2103/IS 2508 laid over tack coat with side and end overlapping not less than 300mm all as approved by GE.
Note for Item No 27 :- Measurement shall be taken for net area and unit rate quoted shall deemed to include for over lapping.
M & L Forming dummy/ contraction joint with an initial saw cut of 3 mm soon after the concrete has set, up to a depth of 1/3rd to 1/4th the thickness of the slab, widening the first saw cut to 6 mm and 24 mm deep by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 8 mm dia, application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of +/- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete as specified and directed.
M & L Forming 25 mm width expansion joint in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vaccum cleaned and free of dirt, oil, vegetation and other debris. The joint then filled with pre-moulded 25 mm thick compressible polyethylene closed cell type filler board as specified, thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 30 mm dia, over filler board and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of +/- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete as specified and directed.
M & L Cutting of construction joints 25 mm deep and 10 mm wide by early saw cut using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 12 mm dia, application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of +/- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete as specified and directed.
Surface dressing not exc 15 cm deep in soft/loose soil all as specified and as directed.
M & L rolIing and consolidating formation surfaces in cutting/ filling to the required gradient and camber including filling in depression and hollow, watering, levelling etc., complete using tandem vibratory/ power roller exceeding 8 tonne and not exceeding 12 tonne capacity all as specified and as directed.
Note for Item No 33 :- Rolling and consolidation the formation surfaces to the required gradient and camber under optimum moisture conditions to achieve at least 98% of maximum dry density determined using modified proctor density determination method as per relevant IS code.
M & L applying one coat of water based paint of black colour on runway/taxiway/apron or other airfield markings of any size and length on runway/taxiway/apron or other airfield markings of any size and length including letters and numeral markings with suitable mechanical pavement marking machine, including removal of existing complete painted area and cleaning of the area by means of wire brushes/ mechanically complete and removal and surfaces exceeding 10 cm wide where directed and all as specified and as directed.
Note for item No 35 :- (i) During week days site will be available for approximate 4 to 5 hours only due to aircraft movements such as landing/take off .
(ii) During weekend days site will be available for 5 to 6 hours. Tenderer shall consider the above points while quoting the rate and no extra payment shall be claimed by the tenderer on account of this.
M & L moorum/red bajri filling including spreading and levelling in layers not exceeding 15 cm thick, spread, levelled and rammed Including watering and rolled to true surfaces with 8 to 12 Ton capacity power roller to achieve compaction of 98% modified proctor density complete all as specified.
Note for Item No 38:- (i) Moorum/red bajri required shall be brought from outside MD land
(ii) Compaction of moorum filling shall be carried out under optimum moisture conditions up to the standard proctor density not less than 98 percent.
(iii) Measurements shall be taken after consolidation earth and 5% deduction shall be made for payments.
M & L for applying Epoxy primer @ 0.45Kg/Sqm over old epoxy surfaces complete all as specified and directed.
M&L Filling the cracks in flexible pavement surface of any size by applying bitumen emulsion @ 0.50 litre per running metre and filled with paste by mixing quartz sand, sand, cement and emulsion in the ratio of 1:10:0.50 and shall be applied in one or two coats to ensure complete filling of the cracks in line with existing pavement structures complete all as specified and as directed.
M&L in repairs to air field cracks using single component 'Aspha-Flo' coal tar free signature grade Gilsonite modified Asphalt emulsion, special polymers and additives streaming crack, joint stuffer to prevent cracks from forming into pot holes and filling of cracks and joints on asphaltic surface of the runway and capable to be applied directly on damp pavement also and coverage shall be 24.20 meter/Ltr for 6mm (width) x 6mm (Depth) crack or 6.05 meter/ L for 13mm x 13mm crack or 2.10 meter/ L for 25mm x 25mm crack complete all as per manufacturer's instructions as specified and directed. Note: Back-up rod to be used in case depth is more than 25mm.
M&L Chipping out neatly and cutting of existing loose concrete of crack at VIP dispersal Pavement by using saw cutter, Cutting of crack portion shall not be less than 100 mm wide and 25 mm deep and clearing of all loose material with air blower/sand blaster and the portion applying proprietory primer on surface to obtain tack and finally filled by Elastomeric concrete mix shall be prepared as per manufacturer instruction to obtain true surface and finally set the surface with hand tools complete all as specified and directed. Make:-M /s Fosroc Chemicals - Patchroc Chemicals, M/s STP Limited- ShaliPatch.and M/s Choksey Chemicals Pvt Ltd. -Flex 0 patch.
Note for item No 45 :- The tenderer shall take into consideration the following points while quoting rate for above item:-
(a) Providing masking tape at joints/ on edge of cut portion and necessary formwork required if any at spalled joints edge to prevent accidental spillage of concrete on top surfaces to give a neat finish. The quoted rate is deemed to be inclusive of this provision.
(b) The rate is deemed to be included for making good the disturbed portion of joint filling around the area where material are applied.
(c) Material shall be procured from the authorised manufacturer only.
(d) The work shall be carried out through authorized and qualified applicators of the manufacturer only in presence of departmental and user representative.
M&L Applying two coats of water based road marking paint such as lines, dashes, arrows, letters, boxes etc on roads, pavements and the like including preparation of surfaces by brushes/ mechanical grinder/sand papers, making surface rough to hold paint exceeding 10 cm wide all as specified and as directed. Note: The cost for using spraying machine including necessary DG Set required to operate machines used for scraping / removal of existing paint deemed to be inclusive in the above quoted rate. Make of road marking paint :M/s Asian paints, M/s Jenson and Nicholson, M/s Berger paints
M & L applying one coat of water based paint of yellow/orange colour on runway/taxiway/apron or other airfield markings of any size and length including letters and numeral markings with suitable spray machine , including removal of existing complete luminous paint area and cleaning of the area by means of wire brushes/ mechanically complete and removal where directed and all as specified and as directed.
Note for item No 51 & 52 :- (i) During week days site will be available for approximate 4 to 5 hours only due to aircraft movements such as landing/take off .
(ii) During weekend days site will be available for 5 to 6 hours. Tenderer shall consider the above points while quoting the rate and no extra payment shall be claimed by the tenderer on account of this.
M&L 100 mm thick PCC 1:2:4 type B-1 using 20 mm graded stone aggregate, as in flooring/paths/paving etc laid in panels , surface finished even and smooth without using extra cement including making 10mm joints with 40mm depth of PCC at every 3 metres and at every change of direction and filling the same with & including bitumen and sand 1:2 sealing compound by weight complete including demolishing existing concrete and disposal to outside MD land all as specified and as directed.
Note for Item No 55:- The concrete shall be laid at a stretch not exceeding 3 metre in length and width of joint shall not be more than 12 mm.
M & L remove the existing damaged filled sealing compound including polyethylene rod by raking end using blow lamp and cleaning of expansion/construction/dummy joints of concrete pavement free from dust and applying masking tape on edge of joint to prevent accidental spillage of sealant on top surfaces to give a neat finish to the sealant, provision of polyethethylene backup, rod 25-35mm dia in expansion joint and sealed with 10-12 mm thick polyurethane based sealing compound confirming to BS 5212-1990 or equivalent of approved colour after application of suitable primer and removing the masking tape after the sealant filling etc complete all as specified and as per manufacturers instructions. Note :- The size of the joint is 20 to 30 mm wide for expansion joint.
Note for item No 57:- (a) The existing sealant compound shall be taken out completely using blow lamp and joint shall be cleaned with wire brush and loose particles dust etc shall be removed by using hand pump before applying primer.
(b) Any spillage of material during filling over the slab shall be removed and cleaned by contractor and any damage accrued to the concrete slab will be made good by the contractor without any extra cost to the department.
M & L remove the existing damaged filled sealing compound including polyethylene rod by raking end using suitable equipment and cleaning of joints of Bitumen pavement in full depth, 15-20cm deep and clean the joint properly to make free flow for water to drain out easily from the joint and free from dust and applying masking tape on edge of joint to prevent accidental spillage of sealant on top surfaces to give a neat finish to the sealant, provision of polyethylene backup rod 10 mm to 15 mm dia in joint and sealed with polyurethane sealant based or equivalent sealing compound, 10 mm-12mm thick above back up rod confirming to BS 5212-1990 or equivalent of approved colour after application of suitable primer and removing the masking tape after the sealant filling etc complete all as specified and as per manufacturers instructions. The size of the joint is 8mm to12mm wide for construction/dummy joint.
Note for item No 60 :- (a) The existing sealant compound shall be taken out completely using blow lamp and joint shall be cleaned with wire brush and loose particles dust etc shall be removed by using hand pump before applying primer.
(b) Any spillage of material during filling over the slab shall be removed and cleaned by contractor and any damage accrued to the concrete slab will be made good by the contractor without any extra cost to the department.
M&L DTGM board black colour 4mm thick acrylic sheets 02 Nos each of size 1.50 x 1.20 m with 100 mm dia air pressure clearance circle 8 Nos on each board including acrylic polishing, fixing of retro reflective stickers (red colour) of length 1.00 m and width 0.15m on each board, fixing the boards to 3 nos of 63mm dia PVC pipe heavy duty (Class 5 -IS 4985) 10Kgf/sqcm as vertical post of approx height 2.48 m each pipe covered at top with PVC caps on each pipes and inter connecting the vertical PVC pipes at top, middle, bottom portion with 25mm dia PVC pipes 15 Kgf/sqcm (IS 4985) fixed with PVC bushes and screws, erecting the frames in GI/MS pipes etc including taking down existing one complete and all as directed by Engineer in charge.
M&L Retro Reflective tape in any pattern, shape/number/letters on old existing boards after cleaning including removing of existing letters/tape complete all as specified and directed.
M&L Filling the pit holes in concrete surfaces of size n exc 15mm in dia and 20mm in deep by using a mixture of quartz sand No 9 -450 parts by weight, Hardner Hy 140-50 parts by weight and araldite GY 257-100 parts by weight to form a hard paste and filling the pit holes after cleaning the dust particles with blower and applying primer coat with epoxy resin of mix with formulation of 100 parts of araldite GYZ 57 and 50 parts of hardner Hy 840 by weight and ramming with hammer to make a uniform surface to match with the existing concrete surfaces all as specified and as directed.
Note for item No 65 :- (a) Contractor shall provide 02 Nos of skilled manpower to execute the job on as required basis all as per directed by Engineer in charge.
(b) A pucca register shall be maintained by the contractor and signature of Engr -in-charge and air force authorities to be obtained daily to authenticate the presence of labourers. payment will be made on day to day basis. This register will form part of RAR/final bill for making the payment.
(c) The contractor shall adhere to time frame as per the user's requirement and as per demand. The demand and the location of work will be intimated either by rep of User/ MES rep well in advance. In case of failure to attend the demand in time penalty will be levied @ Rs. 500/- per day for non completing the requirement till completion of work. Note that this penalty is exclusively other than condition 56 of IAFW-2249 and shall be treated as interim condition of the contract.
(d) The nature of work is related to Runway Maintenance. Hence no delay is acceptable.
(e) The decision of the Accepting Officer in this regards shall be final and binding.
M & L Preparing of old black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface using air blowers to remove all loose dirt etc complete and applying of slurry seal containing cold Polymer Modified Emulsion (PME), fine aggregate, mineral fillers, water and spraying the material (slurry seal) having average thickness of 6 mm as per site condition, should be designed such that the initial setting time should be of 2-3 hours but not more than 4 hours and ensure uniform finish of area complete all as per manufacturer’s instructions and all as specified and as directed by Engineer-in-Charge. The mixing of PME and specially designed filler should be mixed in the ratio 2.5 : 1 (filler : PME) to form slurry and should be done mechanically by high power agitator 90 RPM.
Note for item No 71 :- The tenderer shall take into consideration for following points while quoting rate for above item:-
(a) Due care shall be taken for friction parameters during application of PME as per ICAO standard and friction test shall be carried out on newly PME applied surface by using continuous friction testing machine.
(b) Friction parameters shall be between 0.3-0.6 after application of PME. It will be the responsibility of the contractor to arrange portable skid resistance Tester (PSTR) and carry out necessary testing as directed without any extra cost to Govt.
(c) Material shall be procured from the authorised manufacturer only.
(d) The work shall be carried out through authorized and qualified applicators of the manufactor only in presence of departmental and user representative.
(e) Manufacturer should have successfully completed the similar work at defence airfield.
(f) Two year warranty of material performance and application performance shall be obtained by the contractor from the authorized manufacturer of PME and the same shall be submitted to GE on completion of work as specified . Warranty includes the fact that the structure will remain water tight and no further cracks will be formed, excluding damage caused by natural calamities. Permeability test (ASTM D 2434) to be conducted on the surface prior and after to application of treatment.
(g) A sum of 2% of the quoted amount shall be retained out of the final bill amount as security deposit and the same shall be released to the contractor after satisfactory expiry of two years performance guarantee period. A performance guarantee certificate for two years shall be submitted by the contractor to GE on completion of work as specified.
(i) Electric supply shall be arranged by the contractor at its own arrangements and rate deemed to be inclusive.
(j) Trial patch of 10 Sqm shall be carried out by the contractor on runway and approval of same to be taken from GE before execution of complete qty.
(k) The contractor shall adhere to time frame as per the user's requirement and as per demand. The demand and the location of work will be intimated to the contractor either by rep of User/ MES rep well in advance. In case of failure to attend the demand in in time, penalty will be levied for each day @ Rs. 1000/- for non completing the requirement till completion of work. Note that this penalty is exclusively other than condition 56 of IAFW-2249 and shall be treated as interim condition of the contract.
(l) The decision of the Accepting Officer in this regard shall be final and binding.
(j) The nature of work is related to Flight safety. Hence no delay is acceptable.
(k) Minus price adjustment shall be applicable if quantity of PME using less as specified and shall be work out based on paid voucher and market enquire.
(l) plus price adjustment shall be not applicable if quantity of PME Applied more as specified as per surface condition is required.
M & L ''RUNPHALT' bitumen tubing/ rope for filling of cracks on the runway width of crack 5mm to 7mm with the help of screw driver pushing it inside the crack then apply direct flame 20-30 second through torch method complete all as per manufacturers instruction and as directed by Engineer-in-Charge. Make:- M/s Srijan System PVT Ltd or equivalent as approved by GE
M & L 'RUNPHALT' bitumen tubing/ rope for filling of cracks on the runway width of crack 8mm to 10mm with the help of screw driver pushing it inside the crack then apply direct flame 20-30 second through torch method complete all as per manufacturers instruction and as directed by Engineer-in-Charge Make:- M/s Srijan System PVT Ltd or equivalent as approved by GE
M & L remove the existing damaged filled sealing compound including polyethylene rod by raking end using blow lamp and cleaning of expansion/construction/dummy joints of concrete pavement free from dust and applying masking tape on edge of joint to prevent accidental spillage of sealant on top surfaces to give a neat finish to the sealant, provision of polyethethylene backup, rod 15-20mm dia in expansion joint and sealed with 10-12 mm thick polyurethane based sealing compound confirming to BS 5212-1990 or equivalent of approved colour after application of suitable primer and removing the masking tape after the sealant filling etc complete all as specified and as per manufacturers instructions. Note :- The size of the joint is 12 to 18 mm wide for any type of joint.
Note for item No 89 :- (a) The existing sealant compound shall be taken out completely using blow lamp and joint shall be cleaned with wire brush and loose particles dust etc shall be removed by using hand pump before applying primer.
(b) Any spillage of material during filling over the slab shall be removed and cleaned by contractor and any damage accrued to the concrete slab will be made good by the contractor without any extra cost to the department.
M & L for repair to existing construction joints of flexible pavement of size 10 to 20 mm wide and 25 cm depth (average) consisting of following activities
Raking out old decayed/damaged existing sealing compound and cleaning the joints thoroughly by removing dust, dirt foreign material by appropriate electric cutter / diamond cutter and Air Compressor. After cleaning the joints thoroughly, it shall got approved by GE before progressing further.
Removing the existing sealing composing from the edges, bottom and sides of the joints by cutting edges, bottom and sides of the joints 1 mm of the existing construction joints (up to full depth of existing joints) by mechanical tool (diamond cutter) to make the cross section of joint truly rectangular. Note :- Cleaning the edges/sides/bottom of joints by using diamond cutter only and clean surfaces shall got approved by GE. When the cleaning process approved by GE, primer and joint filling done in presence of Engr-in-Charge.
Once again cleaning the joints with compressed air and applying two primer coats up to the 10 to 15mm or above bake up rod depth & width of the existing joints after an interval of 30 minutes to complete prepared surface the joints.
Sealing the joints with polyurethane joints sealant/ X-Seal traffic loop resin type component flexible polyester loop lighting (up to 10 to 15mm or above bake up rod of existing joint) all as per manufacturers instruction including applying masking tap on edges of joints to prevent accidental spillage of sealant on top surface and removing the tap after sealant is applied complete all as specified and directed.
Note for item No 92 to 96 :- (i) Material shall confirm to BS (manufacturer : FOSROC (COLPOR-200 gray) or Chemtallraj India Pvt Ltd. (RALLITHANE) OR STP Ltd (Shalifax PU) OR CICO OR Cippy ply seal. And CALIBUR Construction chemistey- X-seal traffic loop-power component.
Electric supply shall be arranged by the contractor at its own arrangements and rate deemed to be inclusive.
S & F SS Sign board pattern (SS to SS-7), fully retro reflective sign board made of 3mm thick ACP (Aluminum composite panel) sheet framed with 40mm round SS pipe having front/back (both) side entire surface fully bonded with retro reflective sheeting of HIP (High Intensive Prismatic) grade having pressure sensitive adhesive. boarders and message as indicated cut out. Back ground in Blue and matter in white colour tape having two posts of 50mm round SS pipe 3.0mtr long including excavating post holes of 30 x 30 x 30 cm and embedded in PCC 1:3:6 and including taking down and removing rubbish material to outside MD land complete and as directed by Engineer-in-charge
M & L Providing 75mm thick plain cement concrete 1:4:8 type D2 (using 40 mm graded crushed stone aggregate) as in sub base to tiles complete including demolition of concrete and removing rubish material to out side MD land all as specified and directed .
M & L Hardcore of gauge not exceeding 63 mm of broken stones or boulders, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface including demolition of existing undulated hardcore surface and removing the same complete all as specified and directed.
M & L cutting, removing damage portion of concrete surface in square/ rectangular shape for depth of 20 to 30mm thick, cleaning the surface with wire brush or cloth and removing the dirt including the wetness and dampness by means of dryer and supply and laying geo polymer based "Geo Krete - of Make eco materials or equivalent in Fosroc chemicals/ Tiki Tar/ M/s STP Limited/sika india pvt ltd rapid setting curing free semi levelling structural mortar of single compound activated by water for quick construction & levelled the surface to match with existing surface all as per manufacturer’s instructions as specified & directed. The geopolymer based water impermeable concrete resurfacing mortar shall have compressive strength of 15 M Pa in 2 hours and 50 M Pa in 28 days without any water curing and curing compounds having a water penetration of less than 2 MM when tested as per DIN 1048 and RCPT valve of less than 800 coloumbs when tested as per ASTM C 1202.
Note for Item No 102 :- The tenderer shall take into consideration the following points while quoting rate for above item:-
(a) The rate deemed to be included for making good to disturbed portion around the area where material are applied.
(b) Material shall be procured from the authorised manufacturer only.
(c) The work shall be carried out through authorized and qualified applicators of the manufactor only in presence of departmental rep.
Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc., including removing debris material to out side MD land complete all as specified and directed.
M&L Brickwork with fly ash bricks using modular size bricks, straight or curved on plan exc 6m mean radius built in CM 1:6 complete all as specified and as directed
M & L Rendering 15 mm thick in two layers on brick or concrete surfaces,first coat 10mm thick in cement mortar 1:6 and 2nd coat 5mm thick in cement mortar 1:4 mixed with water proofing compound as per manufacturer instructions finished even and smooth without using extra cement complete all as specified and directed.
Note for Item No 109 :- WPC shall be measured and paid seperately under relevant item here-in above.
Supply only integral water proofing compound complete all as specified and directed
jk construction
CAK Enterprises
Neptune Engineers and Builders
A.GOVINDARAJ
D.R ASSOCIATES
KRISHNA ENTERPRISES
devan enterprises
NLK Construction
Lucky Enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .