Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.2 LAccepted-AOC | L1 | Accepted-AOC Lowest rate of tender | |
| 2 | L2₹93.5 L+₹1.3 L (1.46%)Rejected-Finance 2 102A SREE COLONY KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L2 | Rejected-Finance Higher rate | |
| 3 | L4₹94.2 L+₹2.0 L (2.21%)Rejected-Finance | L4 | Rejected-Finance Higher rate | |
| 4 | L5₹96.9 L+₹4.7 L (5.07%)Rejected-Finance | L5 | Rejected-Finance Higher rate | |
| 5 | L6₹93.6 L+₹1.4 L (1.48%)Rejected-Finance | L6 | Rejected-Finance Higher rate |
Tender Value
₹90.8 L
EMD Value
₹1.8 L
Closing Date
9 Jun 2026, 3:00 pmClosed
Executive Engineer, PWD, KNHD
P16 INDIA EXCHANGE PLACE EXTENSION 2ND FLOORKIT BUILDING Kolkata 700 073
Emergent repair of distress concrete, plaster, floor columns etc and inside repairing of Abinash Dutta Maternity Home B.K. Paul Avenue, kolkata - 700005 (Civil work)
2026_WBPWD_5014351_1
WBPWD/EE/KNHD/NIT-13e/26-27
Open Tender
CIVIL WORKS
Percentage
180 days
Abinash Dutta Maternity Home
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 L
Yes
23 Sept 2026
22 May 2026
12 Jun 2026
22 May 2026
9 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately).
Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. | 96 | each | 50 | ₹4,800 |
| 1.01 | Medium size plant of girth of exposed stem above 75 mm. but not exceeding 150 mm. lift upto 6 mtr. | 141 | each | 60 | ₹8,460 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof. | 1.58 | M3 | 447 | ₹706.26 |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof.
upto 150 mm. thick | 1.08 | M3 | 939 | ₹1,014.12 |
| 4 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
Ground floor | 2.4 | M3 | 1,956 | ₹4,694.4 |
| 4.01 | 4th floor | 5.28 | M3 | 2,156 | ₹11,383.68 |
| 5 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. (Ground floor) | 68.44 | M3 | 50 | ₹3,422 |
| 5.01 | 1st floor | 68.44 | M3 | 56 | ₹3,832.64 |
| 5.02 | 2nd floor | 68.44 | M3 | 62 | ₹4,243.28 |
| 5.03 | 3rd floor | 68.44 | M3 | 68 | ₹4,653.92 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
2911_NRe_6th5696FY011019_M3_ChangeOK.pdf
Tender Documents • 0.99 MB
BOQ_5082383.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .