Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC REJECTED |
| 3 | L3₹1.6 LRejected-AOC LAMAHATTA DARJEELING | ₹1.6 L | L3 | Rejected-AOC REJECTED |
Tender Value
₹1.6 L
EMD Value
₹3,110
Closing Date
5 Mar 2026, 6:00 pmClosed
Pradhan
LOWER SONADA II GRAM PANCHAYAT
CONSTRUCTION OF DRAIN FROM HARI GURUNG HOUSE TO RATOMATAY SHANTI BAZAR SANSAD VII
2026_GTA_1013133_1
06/LS-II GP/16th CFC Lower Sonada II Gram Panchayat Dt 26.02.2026
Open Tender
CIVIL WORKS
LOWER SONADA GRAM PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹3,110
Yes
10 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Labour Cess
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
NIT06.pdf
Tender Documents • 1.11 MB
BOQ_2491816.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid